• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Shaanxi announces capacity replacement adjustment scheme of Shaan Steel Group Longsteel construction project

    2022-01-27 18:16:12   [Print]
    In accordance with the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, Industry and Information Technology Department of Shaanxi Province announced the capacity replacement adjustment scheme of the construction project of Shaan Steel Group Longsteel Company on January 26.Asian Metal CopyrightIn accordance with the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, Industry and Information Technology Department of Shaanxi Province announced the capacity replacement adjustment scheme of the construction project of Shaan Steel Group Longsteel Company on January 26.Asian Metal Copyright The company will build a new 135-ton electric furnace and demolish a 94-ton converter and a 1,280-cubic meter blast furnace.
    .Asian Metal Copyright The company will build a new 135-ton electric furnace and demolish a 94-ton converter and a 1,280-cubic meter blast furnaceAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.