• Copper Conc. TC 25%min CIF China(-1)  05-14|Antimony Ingot 99.85%min EXW China(3000)  05-14|Tungsten Powder 99.95%min 2.5-7.0μm EXW China(9)  05-14|Ethylene Glycol Antimony 57%min Delivered China(2000)  05-14|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-14|Tin Conc. Burmese 30%min In warehouse MengA(6000)  05-14|Antimony Trioxide 99.5%min Delivered China(2500)  05-14|Zinc Conc. TC 50% CIF China(-1.2)  05-14|Vanadium Pentoxide Powder 98%min EXW China(2000)  05-14|Tin Conc. 60%min Delivered China(6000)  05-14|Antimony Trioxide 99.5%min In warehouse Baltimore(0.15)  05-14|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdam(20)  05-14|Rhenium APR 99.99%min EXW China(100)  05-14|Tungsten Bar W-4 99.9%min EXW China(8)  05-14
  • Xiaoyi Jinhui's 2.05Mtpy coking project begins commercial production

    2021-09-27 10:42:27   [Print]
    On September 21, Xiaoyi Jinhui saw production from the No.Asian Metal Copyright With a construction period of two years, the project, when completed, is expected to produce 2.Asian Metal Copyright2 coking furnace of its coking project with an annual production capacity of 2.Asian Metal CopyrightOn September 21, Xiaoyi Jinhui saw production from the No.Asian Metal Copyright05 million tons, marking the formal start of commercial production of the furnace.

    With a construction period of two years, the project, when completed, is expected to produce 2.05 million tons of coke, 100,000 tons of LNG and 250,000 tons of synthetic ammonia annually.

    .Asian Metal Copyright05 million tons, marking the formal start of commercial production of the furnaceAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.