• Manganese Ore Gabonese 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Gabonese 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Australian 45%min In Qinzhou Port(3)  05-15|Manganese Ore Australian 45%min In Tianjin Port(3)  05-15|Copper Conc. TC 25%min CIF China(-1)  05-15|Antimony Trioxide 99.8%min Delivered China(3000)  05-15|Tungsten APT 88.5%min FOB China(10)  05-15|Lithium Carbonate 99.2%min Delivered China(-3000)  05-15|Lithium Carbonate 99.5%min Delivered China(-3000)  05-15|Tungsten Oxide WO3 99.95%min FOB China(10)  05-15|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-15|Lithium Manganate Mn 58% Delivered China(-1000)  05-15
  • Raw coal output of enterprises above designated size in Yunnan up by 14.7% YOY in H1

    2021-07-27 14:33:27   [Print]
    According to data recently released by Energy Administration of Yunnan Province, in the first half of this year, coal enterprises above designed size in Yunnan produced a total of about 28.Asian Metal Copyright7% YOY.Asian Metal Copyright46 million tons of raw coal, up by 14.Asian Metal Copyright As of July 13, 114 coal mines in Yunnan had restarted production or construction, with an annual production capacity of 62.Asian Metal Copyright7% YOY.Asian Metal Copyright7% YOY.Asian Metal Copyright As of July 13, 114 coal mines in Yunnan had restarted production or construction, with an annual production capacity of 62.Asian Metal Copyright As of July 13, 114 coal mines in Yunnan had restarted production or construction, with an annual production capacity of 62.Asian Metal Copyright65 million tons.
    .Asian Metal Copyright65 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.