• Copper Conc. TC 25%min CIF China(-1)  05-07|Ethylene Glycol Antimony 57%min Delivered China(2000)  05-07|Indium Ingot 99.995%min EXW China(70)  05-07|Ferro-gadolinium Gd 73% EXW China(5000)  05-07|Gadolinium Oxide 99.5%min EXW China(5000)  05-07|Alumina 98.5%min EXW China(90)  05-07|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdam(-0.04)  05-07|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  05-07|Zinc Conc. TC 50% CIF China(-1.4)  05-07|Vanadium Pentoxide Flake 98%min EXW China(2000)  05-07|Antimony Trioxide 99.5%min In warehouse Rotterdam(0.3)  05-07|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  05-07|Caustic Soda 32%min Delivered China(-70)  05-07|Vanadium Pentoxide Flake 98%min CIF China(0.1)  05-07
  • Shaanxi Zhaoshipan Coal Mine approved to start construction

    2021-07-05 16:48:32   [Print]
    It's reported that on June 28, Zhaoshipan Coal Mine formally obtained the Notice on the Start of Construction Recordation of Zhaoshipan Coal Mine in Yuheng Mining Area from the Shaanxi Provincial Development and Reform Commission.

    The construction site of the project is located in Hengshan District, Yulin City, Shaanxi. The total investment of the project is RMB6.Asian Metal Copyright The total construction period is 52 months, and the joint trial operation of the mine is planned in May 2025.Asian Metal Copyright504 billion (USD1.Asian Metal Copyright .Asian Metal Copyright00 billion) (excluding mining rights expenses).Asian Metal Copyright00 billion excluding mining rights expenses.Asian Metal Copyright The total construction period is 52 months, and the joint trial operation of the mine is planned in May 2025.

    The Zhaoshipan Coal Mine Project has a designed production capacity of 6 million tons per year, a service life of 71.7 years, and the supporting construction of a coal preparation plant of the same scale.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.