• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Hailiang Group starts construction of non-ferrous intelligent manufacturing industrial park

    2018-12-11 16:27:37   [Print]
    On December 8th, Hailiang Group held a grand opening ceremony for its non-ferrous intelligent manufacturing industrial park ("the Park") in Zhuji modern environmental protection equipment high-tech industrial park.

    With a total investment of 6,128 million yuan, the Park has a planned area of 1,000 mu and the construction is divided into three phases. As for the first phase, the company plans to build a 400,000tpy copper and copper alloy bar intelligent energy saving, emission reduction, relocation and expansion project and expects to finish the construction in December 2019; in regard to the second phase, the company plans to construct a 150,000tpy precision aluminum project which is expected to be delivered in June 2021; with respect to the third phase, the company will build non-ferrous metal processing upstream and downstream extension project and innovative experimental platform project with the construction for both of the projects expected to be completed before December 2022.

    .Asian Metal Copyright As for the first phase, the company plans to build a 400,000tpy copper and copper alloy bar intelligent energy saving, emission reduction, relocation and expansion project and expects to finish the construction in December 2019; in regard to the second phase, the company plans to construct a 150,000tpy precision aluminum project which is expected to be delivered in June 2021; with respect to the third phase, the company will build non-ferrous metal processing upstream and downstream extension project and innovative experimental platform project with the construction for both of the projects expected to be completed before December 2022Asian Metal Copyright
    Aluminum Hydroxide 64.5%min EXW China
    Unit:RMB/mt
    China secondary aluminum alloy producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.