• Ferro-molybdenum 65%min In warehouse USup(2.2)  02-09|Spodumene Li2O 6%min CIF Chinadown(-60)  02-09|Bastnaesite TREO 70%min EXW Chinaup(1300)  02-09|Cobalt Metal 99.8%min Delivered Chinaup(12)  02-09|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(22000)  02-09|Ferro-vanadium 50%min In warehouse Russiaup(28)  02-09|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2800)  02-09|Spodumene Li2O 3%min In port Chinadown(-60)  02-09|NdFeB Sintered Rough N35 Block EXW Chinaup(5)  02-09|Ferro-molybdenum 60%min In port South Koreaup(1.7)  02-09|Ferro-molybdenum 65%min In warehouse Rotterdamup(1.7)  02-09|Neodymium Oxide 99.5%min EXW Chinaup(23000)  02-09|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinadown(-13)  02-09|Praseodymium Oxide 99.5%min EXW Chinaup(23000)  02-09
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Million Link (Tianjin) International Trading Co.

    • Contact: 
    • Gang Xia
    • Tel: 
    • 022-26473070/26473118
    • Fax: 
    • Date :
    • 2010-09-10 14:40:45
    • Buy/Sell:
    • sell
    • Metal :
    • LOW CARBON FERRO CHROME
    • Specification:
    • A) Chemical Analysis: Cr (Chromium)72.17% C (Carbon) :0.078% max. Si (Silicon) :0.79% max. S (Sulphur) : 0.0077% max. P (Phosphorus):0.026% max. B) Size 10-50 mm ( 90% min.)
    • Quantity:
    • 50
    • Price:
    • EX_WAREHOUSE 2.0700 / LbCr CFR
    • Origin:
    • Turkey
    • Packing:
    • 1mt bags
    • Loading Port:
    • ROTTERDAM
    • Shipment Date:
    • ready cargo
    • Delivery:
    • EX_WAREHOUSE
    • Payment:
    • L/C或T/T advance
    • Documents:
    • INVOICE,PACKING LIST,INSPECTION CERTIFICATE,ORIGIN CERTIFICATE
    • Inspection:
    • third party inspection
    • Validity:
    • 22th,sep
    • Remark:
    • none
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.