• Copper Cathode 99.99%min Delivered Chinaup(3600)  02-04|Copper Conc. 20%min Delivered Chinaup(3500)  02-04|Tungsten APT 88.5%min EXW Chinaup(30000)  02-04|Tungsten Ore WO3 55%min EXW Chinaup(20000)  02-04|Tungsten Ore WO3 65%min EXW Chinaup(20000)  02-04|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(45)  02-04|Ferro-vanadium 80%min In warehouse Pittsburghup(0.9)  02-04|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(35)  02-04|Tin Conc. Burmese 20%min In warehouse MengAdown(-11000)  02-04|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(290)  02-04|Lanthanum Oxide 99.999%min EXW Chinaup(800)  02-04|Tin Conc. Burmese 30%min In warehouse MengAdown(-11000)  02-04|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinadown(-12)  02-04|Lithium Metal 99.9%min Delivered Chinadown(-30000)  02-04
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Plenitude Capital Sdn Bhd

    • Contact: 
    • Zaff Dato Khairuddin
    • Tel: 
    • +60179939370
    • Fax: 
    • +6043512040
    • Date :
    • 2013-12-17 13:10:17
    • Buy/Sell:
    • sell
    • Metal :
    • Iron Ore Joint Venture Operations
    • Specification:
    • Investor: JV Operations of Iron Ore Mining in Sungai Siput, Perak, Malaysia We are the owner of the mining site seeking for JV partner with low investment and enable to commence works immediately as all the Mining Licenses from Malaysian's Authorities had obtained. We apply option either totally taking over or we can cooperate to run the mining. Round table discussion is widely open for the benefit of both parties and on "WIN-WIN" situation. Tested Methods: Energy Dispersive X-Ray (EDX) Fe(%) : 71.49% P(%) : 0.03% S(%) : 0.11% Mn(%) : NA% As(%) : 0.15% Si(%) : 0.18% O(%) : 28.07% Ca(%) : NA Mg(%) : NA Sio2(%): NA AI2O3(%): NA
    • Quantity:
    • >30,000 MT p/Month
    • Price:
    • Neg
    • Origin:
    • Malaysia
    • Packing:
    • Bulk Vessel
    • Loading Port:
    • Perai, Butterworth, Malaysia
    • Shipment Date:
    • 90 Days
    • Delivery:
    • FOB
    • Payment:
    • MT103, TT or Cash
    • Documents:
    • Mining License Obtained can commence immediately
    • Inspection:
    • Completed by Geologist: University of Petronas
    • Validity:
    • 2 weeks
    • Remark:
    • JV Operations as First Come, First Serves Basis
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.