• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Longxing Graphite Mine starts in Luobei Yunshan Graphite Park in Heilongjiang

    2021-04-08 16:05:43   [Print]
    On April 6, the Longxing Graphite Mine in Yunshan Graphite Park, Luobei, Heilongjiang, held a resumption ceremony, marking the official start of graphite mining in the park in 2021.

    It's understood that in 2020, Longxing Graphite Mine produced over 4 million tons of ore, driving the production of fine graphite powder in the park to exceed 380,000t and the output of spherical graphite to exceed over 120,000t.

    .Asian Metal Copyright It's understood that in 2020, Longxing Graphite Mine produced over 4 million tons of ore, driving the production of fine graphite powder in the park to exceed 380,000t and the output of spherical graphite to exceed over 120,000tAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.