• Zinc Conc. 50%min EXW South China TCdown(-350)  04-27|Zinc Conc. 50%min EXW North China TCdown(-350)  04-27|Zinc Conc. Zn 50%min, Ag 150g/dt min EXW China Ag payabledown(-5)  04-27|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-30)  04-27|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-350)  04-27|Ferro-tungsten 70%min EXW Chinadown(-35000)  04-27|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-25)  04-27|Spodumene Li2O 5%min In port Chinaup(90)  04-27|Ferro-tungsten 75%min EXW Chinadown(-35000)  04-27|Nickel Cathode Norilsk 99.96%min In port Chinaup(4000)  04-27|Spodumene Li2O 3%min In port Chinaup(70)  04-27|Nickel Cathode 99.96%min EXW Chinaup(4000)  04-27|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-25)  04-27|Nickel Ore Philippine 1.5%min CIF Chinadown(-2)  04-27
  • Shuangliang Eco-Energy Systems and Inner Mongolia Tongwei Silicon sign high-purity crystalline silicon equipment supply contract

    2021-02-23 16:42:31   [Print]
    Shuangliang Eco-Energy Systems Co.Asian Metal Copyright4 million yuan 11.Asian Metal Copyright, Ltd.Asian Metal Copyright4 million yuan 11.Asian Metal Copyright announced on February 22 that the company recently signed a sales contract with Inner Mongolia Tongwei Silicon Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright Contract performance period: The delivery shall be completed before October 1, 2021.Asian Metal Copyright The contract object is the multi-bar reduction furnace equipment used in the 50,000tpy phase II high-purity crystalline silicon project of Inner Mongolia Tongwei Silicon Co.Asian Metal Copyrightand the contract amount is 77.Asian Metal Copyright, Ltd.Asian Metal Copyright98 US million dollars.Asian Metal Copyright and the contract amount is 77.Asian Metal Copyright .Asian Metal Copyright4 million yuan (11.Asian Metal Copyright Contract performance period: The delivery shall be completed before October 1, 2021.Asian Metal Copyright98 US million dollars).Asian Metal Copyright Contract performance period: The delivery shall be completed before October 1, 2021.Asian Metal Copyright Contract performance period: The delivery shall be completed before October 1, 2021.

    .Asian Metal Copyright The contract object is the multi-bar reduction furnace equipment used in the 50,000tpy phase II high-purity crystallinesilicon project of Inner Mongolia Tongwei Silicon CoAsian Metal Copyright
    Silicon Metal 5-5-3 Delivered Europe
    Unit:EUR/mt
    Silicon Metal 5-5-3 Delivered Europe EUR/mt
    China silicon metal producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.