• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Longteng Special Steel records successful hot test run of high-speed end plate production line

    2021-01-21 12:07:55   [Print]
    According to the news from MCC Huatian, Changshu-based Longteng Sepcial Steel recorded a successful hot test run of the high-speed end plate production line, which was constructed by MCC Huatian.

    As a continuous tandem rolling mill, the production line breaks through technical bottlenecks and adopts continuous tandem rolling, automatic crimping and automatic insulated transportation for the goal of significantly increasing output and improving product quality. With the initial planning in August 2019, the project was estimated to go into commercial production in mid-December 2020.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.