• Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-15|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-15|Rhenium APR 99.99%min EXW Chinaup(250)  07-15|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  07-15|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(80)  07-15|Cobalt Chloride 24%min Delivered Chinaup(1500)  07-15|Polysilicon 9N Delivered Chinaup(1)  07-15|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-15|Fluorspar 97%min Delivered Chinadown(-80)  07-15|Cobalt Carbonate 46%min Delivered Chinaup(3000)  07-15|Silicon Metal 97%min EXW Chinaup(200)  07-15|Titanium Dioxide R TiO2 93%min FOB Chinadown(-50)  07-15|Copper Conc. TC 25%min CIF Chinadown(-1)  07-15|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  07-15
  • Xinhui Baise-Wenshan starts poverty alleviation project for aluminum rod and aluminum refining and deep processing industry

    2021-01-13 17:37:09   [Print]
    On January 6th, 2021, the poverty alleviation project with annual production of 200,000 tons of aluminum rods and 100,000 tons of aluminum deep processing products of Xinhui Baise-Wenshan was started.

    The project is invested and constructed by Guangdong Xinhui Industrial Co., Ltd.Asian Metal Copyright2 billion USD185 million and annual output value of about RMB6 billion USD926 million.Asian Metal Copyright with self-raised funds.Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park new material industrial park covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park (new material industrial park) covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright .Asian Metal Copyright2 billion (USD185 million) and annual output value of about RMB6 billion (USD926 million).Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park new material industrial park covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright The first phase of the project covering an area of 90mu with an annual output of 80,000 tons of aluminum rods is scheduled to start production in 2021.Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park new material industrial park covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright The second phase covering an area of 60mu with an annual output of 120,000 tons of aluminum rods is planned to start production during 2022 and 2024.Asian Metal Copyright The project is invested and constructed by Guangdong Xinhui Industrial Co.Asian Metal Copyright The third phase covering an area of 350 mu with a deep processing capacity of 100,000 tons of high-end industrial aluminum profiles, aluminum plates, aluminum structural parts and other aluminum products is planned to start production from 2025 to 2027.

    .Asian Metal Copyright The project is invested and constructed by Guangdong Xinhui Industrial CoAsian Metal Copyright
    Bauxite Malaysian 40%min CIF China
    Unit:USD/dt
    Bauxite Malaysian 40%min CIF China USD/dt
    China bauxite producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.