• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • Xinhui Baise-Wenshan starts poverty alleviation project for aluminum rod and aluminum refining and deep processing industry

    2021-01-13 17:37:09   [Print]
    On January 6th, 2021, the poverty alleviation project with annual production of 200,000 tons of aluminum rods and 100,000 tons of aluminum deep processing products of Xinhui Baise-Wenshan was started.

    The project is invested and constructed by Guangdong Xinhui Industrial Co., Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright with self-raised funds.Asian Metal Copyright .Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park (new material industrial park) covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright The first phase of the project covering an area of 90mu with an annual output of 80,000 tons of aluminum rods is scheduled to start production in 2021.Asian Metal Copyright2 billion (USD185 million) and annual output value of about RMB6 billion (USD926 million).Asian Metal Copyright The project, located in Baise-Wenshan interprovincial economic cooperation park new material industrial park covering an area of 500mu, would have an annual production capacity of 200,000 tons of aluminum rods and 100,000 tons of deep-processed aluminum products, with total investment of about RMB1.Asian Metal Copyright The first phase of the project covering an area of 90mu with an annual output of 80,000 tons of aluminum rods is scheduled to start production in 2021.Asian Metal Copyright The second phase covering an area of 60mu with an annual output of 120,000 tons of aluminum rods is planned to start production during 2022 and 2024.Asian Metal Copyright The second phase covering an area of 60mu with an annual output of 120,000 tons of aluminum rods is planned to start production during 2022 and 2024.Asian Metal Copyright, Ltd.Asian Metal Copyright The third phase covering an area of 350 mu with a deep processing capacity of 100,000 tons of high-end industrial aluminum profiles, aluminum plates, aluminum structural parts and other aluminum products is planned to start production from 2025 to 2027.

    .Asian Metal Copyright The first phase of the project covering an area of 90mu with an annual output of 80,000 tons of aluminum rods is scheduled to start production in 2021Asian Metal Copyright
    Aluminum Ingot 99.7%min In warehouse Foshan
    Unit:RMB/mt
    Aluminum Ingot 99.7%min In warehouse Foshan RMB/mt
    China alumina producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.