• Tungsten APT 88.5%min FOB Chinaup(20)  09-19|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-12)  09-19|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-12)  09-19|Spodumene Li2O 5%min In port Chinaup(30)  09-19|Tungsten Ore WO3 50%min FOB Africaup(13)  09-19|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.3)  09-19|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-19|Praseodymium Oxide 99.5%min FOB Chinaup(2500)  09-19|Tungsten Oxide WO3 99.95%min FOB Chinaup(15)  09-19|Neodymium Oxide 99.5%min FOB Chinaup(2500)  09-19|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-10)  09-19|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  09-19|Spodumene Li2O 3%min In port Chinaup(20)  09-19|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-19
  • Tangshan releases air pollution prevention and control measures for autumn and winter of 2020-2021

    2020-10-13 12:02:54   [Print]
    In order to carry out requirements of relevant departments, start air pollution prevention and control work for autumn and winter of 2020-2021, improve the quality of air and ensure the health of people, Tangshan recently released a notice of emission reduction measures for industrial enterprises during autumn and winter of 2020-2021.Asian Metal Copyright The coking time for enterprises with B-level should extend to 28 hours and over 32 hours for enterprises with C-level.Asian Metal Copyright The valid period of this notice is from 0:00 of October 1, 2020 to 24:00 of March 31, 2021.

    For iron and steel industry, enterprises with performance level of A, i.e.Asian Metal Copyright For iron and steel industry, enterprises with performance level of A, i.Asian Metal Copyright Shougang Qiansteel and Shougang Jingtang should take emission reduction measures autonomously; enterprises with performance level of B should take measures to limit production of blast furnaces by 10%.Asian Metal Copyright Shougang Qiansteel and Shougang Jingtang should take emission reduction measures autonomously; enterprises with performance level of B should take measures to limit production of blast furnaces by 10%.Asian Metal Copyright The ratio is 20% for enterprises with C-level, 35% for enterprises with D-level and 45% for enterprises with E-level respectively.

    For coking industry, enterprises with performance level of A should take emission reduction measures autonomously. The coking time for enterprises with B-level should extend to 28 hours and over 32 hours for enterprises with C-level.
    .Asian Metal CopyrighteAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.