• Copper Conc. TC 25%min CIF Chinadown(-3)  07-11|Polysilicon 9N Delivered Chinaup(2)  07-11|Silicon Metal 4-4-1 Delivered Chinaup(300)  07-11|Silicon Metal 4-2-1 Delivered Chinaup(300)  07-11|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Erbium Oxide 99.5%min EXW Chinaup(9)  07-11|Antimony Ingot 99.65%min In port Indiaup(140)  07-11|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  07-11|Iron Ore Fine Australian 62%min In port Chinaup(20)  07-11|Dysprosium Oxide 99.5%min EXW Chinaup(45)  07-11|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Iron Ore Fine Australian 62%min CNF Chinaup(2.5)  07-11|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-11|Rhenium APR 99.99%min EXW Chinaup(200)  07-11
  • Jingye Iron and Steel suspends operation of blast furnace and converter

    2020-10-12 11:47:06   [Print]
    On 30 September, Pingshan county government announced that it was required to shut down 190,000 tons of ironmaking production capacity and 420,000 tons of steelmaking production capacity in 2020 according to the "notice about iron and steel overcapacity reduction in 2020" released by Shijiazhuang municipal government and halted operation of related smelting equipment of Jingye Iron and Steel before the end of September.

    On 30 September, Jingye Iron and Steel suspended operation of its blast furnace and converter, meeting the requirement on suspension.

    .Asian Metal Copyright On 30 September, Jingye Iron and Steel suspended operation of its blast furnace and converter, meeting the requirement on suspensionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.