• Silico-manganese 65/17 EXW China(500)  05-08|Silico-manganese 60/14 EXW China(300)  05-08|Ammonium Metavanadate 98%min EXW China(3000)  05-08|Vanadium Pentoxide Powder 98%min EXW China(3000)  05-08|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  05-08|Manganese Ore Australian 45%min In Tianjin Port(1.8)  05-08|Manganese Ore Gabonese 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Gabonese 44%min In Tianjin Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Qinzhou Port(1.7)  05-08|Manganese Ore Brazilian 44%min In Tianjin Port(1.7)  05-08|Manganese Ore S.A. 36%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 36%min In Tianjin Port(1.5)  05-08|Manganese Ore S.A. 37%min In Qinzhou Port(1.5)  05-08|Manganese Ore S.A. 37%min In Tianjin Port(1.5)  05-08
  • Aksu starts construction of VRB Industrial Park

    2020-09-28 16:06:10   [Print]
    On September 23, the ground-breaking ceremony for the Vanadium Redox Flow Battery (VRB) Industrial Park in Aksu, Xinjiang was held in Aksu Economic and Technological Development Zone.

    This project is the first energy storage equipment manufacturing base invested and built by Weilide Energy Group in Xinjiang, with the total investment of about RMB700 million (USD103 million). It will build a high-level automated digital factory of 40000 square meters, and can have the production capacity of 100MW VRB storage equipment after the construction ends.Asian Metal Copyright This project is the first energy storage equipment manufacturing base invested and built by Weilide Energy Group in Xinjiang, with the total investment of about RMB700 million USD103 million.Asian Metal Copyright Its annual output would be not lower than RMB3 billion (USD440 million) within three years after it achieves the target output, with the profit tax no less than RMB240 million (USD35.Asian Metal Copyright Its annual output would be not lower than RMB3 billion USD440 million within three years after it achieves the target output, with the profit tax no less than RMB240 million USD35.Asian Metal Copyright18 million).

    .Asian Metal Copyright This project is the first energy storage equipment manufacturing base invested and built by Weilide Energy Group in Xinjiang, with the total investment of about RMB700 million USD103 millionAsian Metal Copyright
    Vanadium Pentoxide Flake 98%min CIF China
    Unit:USD/lb V2O5
    China ammonium metavanadate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.