• Zinc Conc. TC 50%min CIF Chinadown(-5)  11-26|Yttrium Oxide 99.999%min In warehouse Rotterdamup(5)  11-26|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  11-26|Erbium Oxide 99.5%min In warehouse Rotterdamup(2)  11-26|Terbium Oxide 99.99%min In Warehouse Rotterdamup(120)  11-26|Zinc Conc. 50%min EXW Chinaup(500)  11-26|Antimony Ingot 99.65%min In warehouse Rotterdamdown(-1100)  11-26|Spodumene Li2O 6%min CIF Chinaup(30)  11-26|Gadolinium Oxide 99.99%min In Warehouse Baltimoreup(5)  11-26|Dysprosium Oxide 99.5%min In Warehouse Rotterdamup(25)  11-26|Neodymium Metal 99%min FOB Chinadown(-2.5)  11-26|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  11-26|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  11-26|Silicon Metal 98.5%min Delivered USdown(-0.03)  11-26
  • Shandong Jining Shengfa Coking formally ignites No.2 coke oven

    2020-07-10 17:23:35   [Print]
    Shandong Jining Shengfa Coking Co.Asian Metal Copyright The project is located in Zhanghuang Industrial Park in Yutai, Jining with a total investment of RMB2.Asian Metal Copyright, Ltd.Asian Metal CopyrightShandong Jining Shengfa Coking Co.Asian Metal Copyright formally ignited its No.Asian Metal Copyright The project is located in Zhanghuang Industrial Park in Yutai, Jining with a total investment of RMB2.Asian Metal Copyright2 coke oven on July 7th, marking that the 1,200,000tpy coal chemical and comprehensive utilization project of phase II technical reform program of the company officially entered the countdown to production.

    The project is located in Zhanghuang Industrial Park in Yutai, Jining with a total investment of RMB2.3 billion (USD328,046,554).

    .Asian Metal Copyright2 coke oven on July 7th, marking that the 1,200,000tpy coal chemical and comprehensive utilization project of phase II technical reform program of the company officially entered the countdown to productionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.