• Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(3)  11-14|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdamup(0.03)  11-14|Ferro-molybdenum 60%min Delivered Indiadown(-80)  11-14|Antimony Ingot 99.65%min EXW Chinaup(4000)  11-14|Sodium Pyroantimonate 58.4% Delivered Chinaup(2000)  11-14|Coal Tar Pitch Coking Value 56%min EXW Chinaup(100)  11-14|Ferro-molybdenum 60%min In warehouse Russiadown(-80)  11-14|Antimony Ingot 99.85%min EXW Chinaup(4000)  11-14|Erbium Oxide 99.5%min FOB Chinaup(1.5)  11-14|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  11-14|Calcined Pet Coke S 3%max EXW Chinadown(-100)  11-14|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(40)  11-14|Antimony Conc. 50%min Delivered Chinaup(3000)  11-14|Antimony Trioxide 99.5%min Delivered Chinaup(3000)  11-14
  • Tangshan further strengthens response to recent pollution weather

    2020-07-10 14:23:53   [Print]
    The Office of the Leading Group for Ecological Environment Protection Work of Tangshan announced on July 9 that, a new round of moderate to severe pollution will occur in Tangshan after July 9. To deal with the pollution process, reduce the pollution index and improve the ambient air quality, after consultation with the Meteorological Bureau of Tangshan, based on the "Air Quality Enhancement and Guarantee Plan in July Tangshan", strict control measures will be taken from 18:00 on July 9 to 18:00 on July 13, including:

    1. Iron and steel enterprises should resume implementation of the "Air Quality Enhancement and Guarantee Plan in July in Tangshan", improve the efficiency of the operation of pollution prevention facilities and minimize the emission of pollutants.

    2. Independent lime kilns, independent hot rolling lines, brick kilns, casting, grinding station and mixing station should strictly implement the emission reduction measures of "Emergency Notice for Strengthening Management and Control" issued on July 5.

    3. Coking enterprises with the performance evaluation level of "C" should keep the coking time of not less than 32 hours.Asian Metal Copyright 2.Asian Metal Copyright Guoyi Coking and Baoliyuan Coking with coke dry quenching process under overhaul should keep the coking time not less than 48 hours.
    .Asian Metal Copyright Iron and steel enterprises should resume implementation of the "Air Quality Enhancement and Guarantee Plan in July in Tangshan", improve the efficiency of the operation of pollution prevention facilities and minimize the emission of pollutantsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.