• Rhenium APR 99.99%min EXW Chinaup(250)  07-14|LNCMO 613 PC Delivered Chinaup(3)  07-14|LNCMO 523 PC Delivered Chinaup(3)  07-14|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(13000)  07-14|Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-14|Neodymium Oxide 99.5%min EXW Chinaup(13000)  07-14|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-14|Neodymium Oxide 99.5%min FOB Chinaup(1700)  07-14|Silicon Metal 97%min EXW Chinaup(200)  07-14|LNCMO 523 SC Delivered Chinaup(3)  07-14|Silico-manganese 65/17 Delivered Europedown(-30)  07-14|Praseodymium Oxide 99.5%min EXW Chinaup(12000)  07-14|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(14000)  07-14|NdFeB Sintered Rough N35 EXW Chinaup(3)  07-14
  • Guangxi Longzhou to put 1,000,000tpy ecological alumina project into operation in Dec

    2020-06-02 15:29:00   [Print]
    It is reported that the 1,000,000tpy ecological alumina project of Guangxi Logzhou is expected to be put into operation in December this year.

    Located in Longbeiguan, Longzhou Town, Longzhou County, Chongzuo, Guangxi, the project covers an area of 499.8mu and has started the construction of infrastructure.Asian Metal Copyright8mu and has started the construction of infrastructure.Asian Metal Copyright The project will be powered on by late October 2020 and will be put into operation in December this year.Asian Metal Copyright After the project is fully put into operation, the annual output value can reach 2.Asian Metal Copyright After the project is fully put into operation, the annual output value can reach 2.Asian Metal Copyright8 billion yuan 393 million US dollars.Asian Metal Copyright8 billion yuan (393 million US dollars).
    .Asian Metal Copyright8mu and has started the construction of infrastructureAsian Metal Copyright
    Alumina 98.5%min FOB Australia
    Unit:USD/mt
    Alumina 98.5%min FOB Australia USD/mt
    China alumina producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.