• Lead Conc. Pb 50%min, Ag 1,000g/dt max EXW China TCdown(-100)  09-24|Iron Ore Fine Australian 58%min In port Chinadown(-20)  09-24|Iron Ore Fine 65%min Ex-VAT EXW Shanxidown(-20)  09-24|Iron Ore Fine Australian 62%min In port Chinadown(-20)  09-24|Cobalt Sulfate 20.5%min Delivered Chinadown(-1500)  09-24|Coal Tar Pitch Coking Value 56%min EXW Chinadown(-200)  09-24|Chromic Anhydride 99.8%min EXW Chinaup(500)  09-24|Spodumene Li2O 3%min In port Chinadown(-50)  09-24|Iron Ore Fine 65%min EXW Liaoningdown(-20)  09-24|HR Coil IS2062 3.0mm IW Mumbaiup(1500)  09-24|Spodumene Li2O 6%min CIF Chinadown(-50)  09-24|Lithium Manganate Mn 58% Delivered Chinadown(-1000)  09-24|Iron Ore Lump Australian 62%min In port Chinadown(-20)  09-24|Iron Ore Fine Brazilian 65%min In port Chinadown(-20)  09-24
  • Azovstal resumes operations at blast furnace No.4 at Azovstal

    2020-05-28 10:30:54   [Print]
    Ukraine-based Metinvest group has announced the resumption of blast furnace No.Asian Metal CopyrightUkraine-based Metinvest group has announced the resumption of blast furnace No.Asian Metal Copyright4 at its subsidiary Azovstal.Asian Metal Copyright .Asian Metal Copyright The company suspended operation at the blast furnace as a resulted of reduced demand caused by COVID-19 related restrictions.Asian Metal Copyright .Asian Metal Copyright During the shutdown, the equipment is said to be overhauled with investments of UAH 21 million.
    .Asian Metal Copyright The company suspended operation at the blast furnace as a resulted of reduced demand caused by COVID-19 related restrictionsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.