• Ferro-molybdenum 65%min In warehouse USup(2.2)  02-09|Spodumene Li2O 6%min CIF Chinadown(-60)  02-09|Bastnaesite TREO 70%min EXW Chinaup(1300)  02-09|Cobalt Metal 99.8%min Delivered Chinaup(12)  02-09|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(22000)  02-09|Ferro-vanadium 50%min In warehouse Russiaup(28)  02-09|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2800)  02-09|Spodumene Li2O 3%min In port Chinadown(-60)  02-09|NdFeB Sintered Rough N35 Block EXW Chinaup(5)  02-09|Ferro-molybdenum 60%min In port South Koreaup(1.7)  02-09|Ferro-molybdenum 65%min In warehouse Rotterdamup(1.7)  02-09|Neodymium Oxide 99.5%min EXW Chinaup(23000)  02-09|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinadown(-13)  02-09|Praseodymium Oxide 99.5%min EXW Chinaup(23000)  02-09
  • Dongying to achieve mass production of high-performance alumina fiber

    2020-05-27 17:29:13   [Print]
    Shandong Dongheng Guoxian New Material Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright Located in Dongying economic and technological development zone, the project would have production capacities of 1,000 tons of high-performance alumina short fiber products and 100 tons of high-performance alumina continuous fiber products with a total investment of RMB600 million USD83.Asian Metal Copyright is installing equipment for the high-performance alumina fiber project in full swing.

    Located in Dongying economic and technological development zone, the project would have production capacities of 1,000 tons of high-performance alumina short fiber products and 100 tons of high-performance alumina continuous fiber products with a total investment of RMB600 million (USD83.82 million).Asian Metal Copyright21 billion.Asian Metal Copyright Its capacity for short fiber products is expected to account for 7% of the total capacity in the world.Asian Metal Copyright The adhesive platform for the two production lines has been built and the equipment is being installed and calibrated.Asian Metal Copyright The first phase of the project with an investment of RMB130 million (USD18.Asian Metal Copyright82 million.Asian Metal Copyright16 million) would include two production lines for high-performance alumina short fiber, realizing a production capacity of 500 tons per year.

    Currently, the first phase project is under construction. The adhesive platform for the two production lines has been built and the equipment is being installed and calibrated.Asian Metal Copyright After reaching full capacity, the project will see an annual output value of RMB1.Asian Metal Copyright The whole project is expected to be completed by the end of June, and the trial production will start in July.Asian Metal Copyright21 billion.Asian Metal Copyright After reaching full capacity, the project will see an annual output value of RMB1.Asian Metal Copyright Currently, the first phase project is under construction.Asian Metal Copyright5 billion (USD0.Asian Metal Copyright, Ltd.Asian Metal Copyright21 billion).

    .Asian Metal CopyrightShandong Dongheng Guoxian New Material CoAsian Metal Copyright
    Alumina 98.5%min FOB Australia
    Unit:USD/mt
    Alumina 98.5%min FOB Australia USD/mt
    China alumina producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.