• Lead Conc. Pb 50%min, Ag 1,000g/dt max EXW China TCdown(-100)  09-24|Iron Ore Fine Australian 58%min In port Chinadown(-20)  09-24|Iron Ore Fine 65%min Ex-VAT EXW Shanxidown(-20)  09-24|Iron Ore Fine Australian 62%min In port Chinadown(-20)  09-24|Cobalt Sulfate 20.5%min Delivered Chinadown(-1500)  09-24|Coal Tar Pitch Coking Value 56%min EXW Chinadown(-200)  09-24|Chromic Anhydride 99.8%min EXW Chinaup(500)  09-24|Spodumene Li2O 3%min In port Chinadown(-50)  09-24|Iron Ore Fine 65%min EXW Liaoningdown(-20)  09-24|HR Coil IS2062 3.0mm IW Mumbaiup(1500)  09-24|Spodumene Li2O 6%min CIF Chinadown(-50)  09-24|Lithium Manganate Mn 58% Delivered Chinadown(-1000)  09-24|Iron Ore Lump Australian 62%min In port Chinadown(-20)  09-24|Iron Ore Fine Brazilian 65%min In port Chinadown(-20)  09-24
  • Approved production capacity of Jinjia mine of Panjiang Refined Coal rises

    2020-05-13 17:02:28   [Print]
    Panjiang Refined Coal announced on May 13 that the annual approved production capacity of Jinjia mine affiliated to the company increased from 1.Asian Metal Copyright45 million tons.Asian Metal Copyright55 million tons to 2.Asian Metal CopyrightPanjiang Refined Coal announced on May 13 that the annual approved production capacity of Jinjia mine affiliated to the company increased from 1.Asian Metal Copyright45 million tons.Asian Metal Copyright1 million tons to 10 million tons.Asian Metal Copyright Up to now, the total annual production capacity of Huopu mine, Yueliangtian mine, Shanjiaoshu mine, Tucheng mine and Jinjia mine has increased from 9.Asian Metal Copyright55 million tons to 2.Asian Metal Copyright1 million tons to 10 million tons.

    .Asian Metal Copyright1 million tons to 10 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.