• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • POSCO plans to make first production cut in 12 years

    2020-05-13 11:59:48   [Print]
    POSCO has decided to make the first cut in production in 12 years since 2008.Asian Metal Copyright In particular, a decline in automobile production had a big impact on the cut.Asian Metal Copyright POSCO plans to reduce production capacity of 980,000 tons in May only by lowering the utilization rate of its production lines such as cold- and hot-rolled steel sheets at Pohang and Gwangyang Works, said sources in the steel industry on May 10.Asian Metal Copyright Specifically, POSCO will cut 180,000 tons at Pohang Works and 800,000 tons at Gwangyang Works.Asian Metal Copyright Specifically, POSCO will cut 180,000 tons at Pohang Works and 800,000 tons at Gwangyang Works.Asian Metal Copyright85 million tons, POSCO will decrease its average monthly production by more than 30%.Asian Metal Copyright Given that the crude steel production of Pohang and Gwangyang Works in Q2 of 2019 hit 8.Asian Metal Copyright Given that the crude steel production of Pohang and Gwangyang Works in Q2 of 2019 hit 8.Asian Metal Copyright85 million tons, POSCO will decrease its average monthly production by more than 30%.

    The main culprit behind this cut is a slowdown in demand from the downstream industry, triggered by the COVID-19 crisis. In particular, a decline in automobile production had a big impact on the cut.

    .Asian Metal Copyright The main culprit behind this cut is a slowdown in demand from the downstream industry, triggered by the COVID-19 crisisAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.