• Copper Cathode 99.99%min Delivered Chinaup(3600)  02-04|Copper Conc. 20%min Delivered Chinaup(3500)  02-04|Tungsten APT 88.5%min EXW Chinaup(30000)  02-04|Tungsten Ore WO3 55%min EXW Chinaup(20000)  02-04|Tungsten Ore WO3 65%min EXW Chinaup(20000)  02-04|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(45)  02-04|Ferro-vanadium 80%min In warehouse Pittsburghup(0.9)  02-04|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(35)  02-04|Tin Conc. Burmese 20%min In warehouse MengAdown(-11000)  02-04|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(290)  02-04|Lanthanum Oxide 99.999%min EXW Chinaup(800)  02-04|Tin Conc. Burmese 30%min In warehouse MengAdown(-11000)  02-04|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinadown(-12)  02-04|Lithium Metal 99.9%min Delivered Chinadown(-30000)  02-04
  • AsianMetal
    Events & Holidays
    event

    Monthly Section Steel & Steel Pipe Market Report Apr 2020

    2020-05-12 08:06:55   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    1. Market Highlights

    Prices for section steel and steel pipe dropped sharply during the month, with the markdown of around RMB200/t (USD28/t) in major Chinese domestic markets. The weak downstream demand contributed to the significant price decline.Asian Metal Copyright In the meantime, steel mills for section steel produced fully, while those for steel pipe produced inactively.Asian Metal Copyright Reporting insufficient orders for finished products and not being confident the market prospect in view of the quick outbreak of the COVID-19 in other countries, end users only purchased from hand to mouth and refused to place orders, with wait-and-see attitudes.Asian Metal Copyright In the meantime, steel mills for section steel produced fully, while those for steel pipe produced inactively.Asian Metal Copyright Meanwhile, traders were inactive in supplementing inventories and eager to conclude deals to avoid potential risks.Asian Metal Copyright Reporting insufficient orders for finished products and not being confident the market prospect in view of the quick outbreak of the COVID-19 in other countries, end users only purchased from hand to mouth and refused to place orders, with wait-and-see attitudes.Asian Metal Copyright In the meantime, steel mills for section steel produced fully, while those for steel pipe produced inactively.

    .Asian Metal Copyright In the meantime, steel mills for section steel produced fully, while those for steel pipe produced inactivelyAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.