• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • Shanshan Corporation to purchase Li-battery raw materials from Evergreen New Energy

    2020-03-26 17:59:55   [Print]
    On the evening of March 25, Shanshan Corporation announced that by April 30 its controlled subsidiary Shanshan New Energy will purchase from Evergreen New Energy raw materials used in producing Li-batteries worth no more than RMB200 million (USD28.Asian Metal Copyright .Asian Metal Copyright15 million).

    Evergreen New Energy is a joint venture set up in October 2018 between Shanshan New Energy, Geely Group and Zijin Mining; it focuses on businesses including used Li-battery utilization, and research, production, selling and import/export of ternary material precursors.

    According to investment agreement on the JV, Evergreen New Energy will pump a total of RMB6.589 billion (USD927 million) within five years into building a three-stage production project consisting of processing 150,000tpa used Li-batteries and producing 100,000tpa NCM precursors.Asian Metal Copyright Stage One project, which has an investment of RMB1.Asian Metal Copyright Stage One project, which has an investment of RMB1.Asian Metal Copyright18 billion USD166 million for building 10,000tpa used Li-battery processing and 20,000tpa NCM precursor production lines, was already built and went into operation at the end of 2019.Asian Metal Copyright18 billion (USD166 million) for building 10,000tpa used Li-battery processing and 20,000tpa NCM precursor production lines, was already built and went into operation at the end of 2019.Asian Metal Copyright Stage One project, which has an investment of RMB1.Asian Metal Copyright What Shanshan Corporation planned to purchase is quite likely NCM precursors just coming off Evergreen New Energy production lines.
    .Asian Metal Copyright According to investment agreement on the JV, Evergreen New Energy will pump a total of RMB6Asian Metal Copyright
    LNCMO 523 SC Delivered China
    Unit:RMB/kg
    LNCMO 523 SC Delivered China RMB/kg
    China lithium cobaltate producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.