• Neodymium Metal 99%min EXW Chinaup(25000)  01-26|Lithium Metal 99.9%min Delivered Chinaup(29000)  01-26|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(20000)  01-26|Neodymium Oxide 99.5%min EXW Chinaup(20000)  01-26|Praseodymium Oxide 99.5%min EXW Chinaup(20000)  01-26|Iron Ore Fine 65%min EXW Shandongdown(-30)  01-26|Lithium Metal 99%min Delivered Chinaup(27000)  01-26|Vanadium Pentoxide Flake 98%min In warehouse Rotterdamup(0.15)  01-26|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(4500)  01-26|Tin Conc. Burmese 20%min In warehouse MengAup(11000)  01-26|Lithium Manganate Mn 58% Delivered Chinaup(1500)  01-26|Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1700)  01-26|Tin Conc. Burmese 30%min In warehouse MengAup(11000)  01-26|Spodumene Li2O 3%min In port Chinaup(60)  01-26
  • Linyi Yili starts constructing new firebrick project

    2020-03-17 15:55:40   [Print]
    On March 14, 20 projects in Junan County and Lingang District of Linyi City started construction, including the new firebrick project with a capacity of 100,000tpy and the firebrick castable project with a capacity of 300,000tpy.

    The project is invested and constructed by Linyi Yili New Material Co., Ltd.Asian Metal Copyright The project is invested and constructed by Linyi Yili New Material Co.Asian Metal Copyright, with a total investment of RMB285 million (USD40.Asian Metal Copyright, Ltd.Asian Metal Copyright75 million) and an area of 100 mu.Asian Metal Copyright86 million.Asian Metal Copyright It uses ferronickel slag, coal ash and other wastes to produce various refractory materials.Asian Metal Copyright The project is invested and constructed by Linyi Yili New Material Co.Asian Metal Copyright The project is scheduled to start construction in March 2020 and put into production in December 2020.Asian Metal Copyright The project is invested and constructed by Linyi Yili New Material Co.Asian Metal Copyright After the production, the annual output value will be RMB500 million (USD71.Asian Metal CopyrightOn March 14, 20 projects in Junan County and Lingang District of Linyi City started construction, including the new firebrick project with a capacity of 100,000tpy and the firebrick castable project with a capacity of 300,000tpy.Asian Metal Copyright48 million), with the tax revenue of RMB20 million (USD2.Asian Metal CopyrightOn March 14, 20 projects in Junan County and Lingang District of Linyi City started construction, including the new firebrick project with a capacity of 100,000tpy and the firebrick castable project with a capacity of 300,000tpy.Asian Metal Copyright86 million).
    .Asian Metal Copyright, with a total investment of RMB285 million USD40Asian Metal Copyright
    Magnesia D.B. 90%min 0-3mm EXW China
    Unit:RMB/mt
    Magnesia D.B. 90%min 0-3mm EXW China RMB/mt
    China fused magnesia producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.