• Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1750)  01-23|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(4600)  01-23|Spodumene Li2O 6%min CIF Chinaup(65)  01-23|Lithium Metal 99.9%min Delivered Chinaup(28000)  01-23|Mercury Metal 99.9%min Ex-VAT EXW Chinaup(45)  01-23|Spodumene Li2O 5%min In port Chinaup(75)  01-23|Indium Ingot 99.995%min EXW Chinaup(100)  01-23|Rebar CB400V/SD390 Φ14-32mm In warehouse Hanoiup(400000)  01-23|Lithium Metal 99%min Delivered Chinaup(26000)  01-23|Lithium Carbonate 99.5%min Delivered EUup(0.5)  01-23|Lithium Carbonate 99.5%min CIF Chinaup(0.5)  01-23|Spodumene Li2O 3%min In port Chinaup(60)  01-23|Mercury Metal 99.999%min Ex-VAT EXW Chinaup(45)  01-23|Lithium Carbonate 99.2%min Delivered Chinaup(4500)  01-23
  • Linyi Yili starts constructing new firebrick project

    2020-03-17 15:55:40   [Print]
    On March 14, 20 projects in Junan County and Lingang District of Linyi City started construction, including the new firebrick project with a capacity of 100,000tpy and the firebrick castable project with a capacity of 300,000tpy.

    The project is invested and constructed by Linyi Yili New Material Co., Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, with a total investment of RMB285 million (USD40.Asian Metal Copyright, Ltd.Asian Metal Copyright75 million) and an area of 100 mu.Asian Metal Copyright, Ltd.Asian Metal Copyright It uses ferronickel slag, coal ash and other wastes to produce various refractory materials.Asian Metal Copyright48 million, with the tax revenue of RMB20 million USD2.Asian Metal Copyright The project is scheduled to start construction in March 2020 and put into production in December 2020.Asian Metal Copyright, with a total investment of RMB285 million USD40.Asian Metal Copyright After the production, the annual output value will be RMB500 million (USD71.Asian Metal Copyright75 million and an area of 100 mu.Asian Metal Copyright48 million), with the tax revenue of RMB20 million (USD2.Asian Metal Copyright The project is scheduled to start construction in March 2020 and put into production in December 2020.Asian Metal Copyright86 million).
    .Asian Metal Copyright The project is scheduled to start construction in March 2020 and put into production in December 2020Asian Metal Copyright
    Magnesia D.B. 90%min 0-3mm EXW China
    Unit:RMB/mt
    Magnesia D.B. 90%min 0-3mm EXW China RMB/mt
    China fused magnesia producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.