• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Sumitomo Metal Mining aims to boost copper output to 300,000t by 2030

    2020-03-05 10:31:47   [Print]
    Japanese miner Sumitomo Metal Mining said on Wednesday it aims to boost its annual copper output through its shareholding to 300,000 tonnes by 2030 under its new long-term vision.Asian Metal Copyright .Asian Metal Copyright The target compares with 250,000 tonnes projected last November for the current financial year to March 31.

    Unveiling a strategy through to 2030, the Japanese company said it wanted to increase use of low-grade nickel ore and start operating its third high-pressure acid leaching (HPAL) plant in the mid-2020s, without giving any further details. HPAL is a process used to extract nickel from laterite ore.

    .Asian Metal Copyright HPAL is a process used to extract nickel from laterite oreAsian Metal Copyright
    Copper Cathode 99.99%min Delivered China
    Unit:RMB/mt
    Copper Cathode 99.99%min Delivered China RMB/mt
    China refined copper producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.