• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Litian Wanshi launches construction of lithium battery and system project

    2020-03-04 15:55:01   [Print]
    A ceremony was held on March 3rd to launch the construction of Litian Wanshi's 20GWh lithium-ion battery and system project.

    The project is located in Zhonghe Industrial Park (Phase ‖) in Jiashan Economy Development Zone. With total capitals of USD500 million and investment of USD1.Asian Metal Copyright .Asian Metal Copyright5 billion, the project is divided into two phases in construction.Asian Metal Copyright5 billion, the project is divided into two phases in construction.Asian Metal Copyright The phase one project of 8GWh lithium-ion battery and system, which has a total investment of USD750 million and fixed asset investment of about RMB3.Asian Metal Copyright5 billion, the project is divided into two phases in construction.Asian Metal Copyright075 billion (USD444 million), will create annual output values of RMB7.Asian Metal CopyrightA ceremony was held on March 3rd to launch the construction of Litian Wanshi's 20GWh lithium-ion battery and system project.Asian Metal Copyright2 billion (USD1.Asian Metal Copyright075 billion USD444 million, will create annual output values of RMB7.Asian Metal Copyright04 billion) and tax revenues of RMB430 million (USD62.Asian Metal Copyright76 million after going into full production.Asian Metal Copyright03 million) after realzing designed production capacity; the phase two project of 12GWh lithium-ion battery and system, which has a total investment of USD750 million and fixed asset investment of about RMB4.Asian Metal Copyright The phase one project of 8GWh lithium-ion battery and system, which has a total investment of USD750 million and fixed asset investment of about RMB3.Asian Metal Copyright6 billion (USD664 million), will generate annual output valumes of RMB10.Asian Metal Copyright The phase one project of 8GWh lithium-ion battery and system, which has a total investment of USD750 million and fixed asset investment of about RMB3.Asian Metal Copyright8 billion (USD1.Asian Metal Copyright With total capitals of USD500 million and investment of USD1.Asian Metal Copyright56 billion) and tax revenues of RMB650 million (USD93.Asian Metal Copyright With total capitals of USD500 million and investment of USD1.Asian Metal Copyright76 million) after going into full production.

    .Asian Metal Copyright5 billion, the project is divided into two phases in constructionAsian Metal Copyright
    Lithium Carbonate 99.5%min Delivered EU
    Unit:USD/kg
    Lithium Carbonate 99.5%min Delivered EU USD/kg
    China lithium carbonate 99.5%mi producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.