• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • 159 coal mines resume production in Ordos by Mar 2nd

    2020-03-04 13:16:11   [Print]
    According to news from Ordos Energy Administration on March 3rd, 2020, the city had restarted 159 coal mines by March 2nd and the coal mines in production had a total production capacity of 550 million tons.Asian Metal Copyright .Asian Metal Copyright On March 2nd, 12 coal mines resumed production, with a total production capacity of 1 million tons.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.