• Tellurium Metal 99.99%min EXW Chinaup(20)  10-24|Erbium Oxide 99.5%min FOB Chinaup(1.5)  10-24|Lithium Cobaltate Co 60%min Delivered Chinaup(10)  10-24|NCM 523 Delivered Chinaup(2700)  10-24|Cobalt Oxide 72%min In warehouse Rotterdamup(0.9)  10-24|LNCMO 8312 PC Delivered Chinaup(5)  10-24|NCM 613 Delivered Chinaup(2500)  10-24|NCM 8312 Delivered Chinaup(3000)  10-24|LNCMO 613 PC Delivered Chinaup(4)  10-24|Cobalt Tetroxide 73.5%min Delivered Chinaup(9)  10-24|Cobalt Metal 99.8%min Delivered Chinadown(-11)  10-24|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-24|LNCMO 523 PC Delivered Chinaup(4)  10-24|Erbium Oxide 99.5%min In warehouse Rotterdamup(1.5)  10-24
  • 159 coal mines resume production in Ordos by Mar 2nd

    2020-03-04 13:16:11   [Print]
    According to news from Ordos Energy Administration on March 3rd, 2020, the city had restarted 159 coal mines by March 2nd and the coal mines in production had a total production capacity of 550 million tons.Asian Metal Copyright .Asian Metal Copyright On March 2nd, 12 coal mines resumed production, with a total production capacity of 1 million tons.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.