• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-15)  09-18|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-18|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.4)  09-18|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-18|Tungsten APT 88.5%min FOB Chinaup(15)  09-18|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-18|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-18|Bismuth Oxide 99.9%min EXW Chinaup(3000)  09-18|Germanium Metal 99.99%min Delivered Europeup(100)  09-18|Germanium Metal 99.99%min Delivered USup(100)  09-18|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurdown(-50)  09-18|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-50)  09-18
  • 113 coal mines in operation in Ordos by Feb 20

    2020-02-24 15:15:22   [Print]
    According to news from Ordos Bureau of Industry and Information Technology, as of February 20, 113 coal mines were in operation in Ordos with the total production capacity of 476 million tons, including 28 coal mines which were still in operation during the Spring Festival with a capacity of 249 million tons and 85 coal mines which resumed production after the festival with a capacity of 227 million tons and a recovery rate of 68%.
      Copyright © Asian Metal Ltd All rights reserved.