• Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(3)  11-14|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdamup(0.03)  11-14|Ferro-molybdenum 60%min Delivered Indiadown(-80)  11-14|Antimony Ingot 99.65%min EXW Chinaup(4000)  11-14|Sodium Pyroantimonate 58.4% Delivered Chinaup(2000)  11-14|Coal Tar Pitch Coking Value 56%min EXW Chinaup(100)  11-14|Ferro-molybdenum 60%min In warehouse Russiadown(-80)  11-14|Antimony Ingot 99.85%min EXW Chinaup(4000)  11-14|Erbium Oxide 99.5%min FOB Chinaup(1.5)  11-14|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  11-14|Calcined Pet Coke S 3%max EXW Chinadown(-100)  11-14|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(40)  11-14|Antimony Conc. 50%min Delivered Chinaup(3000)  11-14|Antimony Trioxide 99.5%min Delivered Chinaup(3000)  11-14
  • Ningbo cancels production resumption approval process

    2020-02-18 17:48:52   [Print]
    On 17 February, the novel coronavirus prevention and control leading group of Ningbo released the "notice about further accelerating production resumption and adjusting production resumption process", according to which production resumption approval process is cancelled and enterprises that are not listed in the negative list can restart operation immediately after making a commitment.

    The notice identified that the program of filing, negative list and commitment is adopted. All enterprises (projects) can resume operation after carrying out prevention and control measures and submitting reports to county (town, street) or industry authorities.Asian Metal Copyright Disqualified enterprises and projects must make rectifications to meet relevant requirements.Asian Metal Copyright Enterprises only need to submit an application (including epidemic prevention plan and employee list) and a letter of commitment.Asian Metal Copyright The notice identified that the program of filing, negative list and commitment is adopted.Asian Metal Copyright The processes of conducting prior survey and issuing survey comments are cancelled.Asian Metal Copyright Disqualified enterprises and projects must make rectifications to meet relevant requirements.Asian Metal Copyright Enterprises that have submit applications don't need to implement the filling process and can restart operation.

    As required by the notice, county (town, street) or industry authorities should conduct on-site inspections on enterprises and key construction projects above limits and conduct spot checks on enterprises and other projects below limits based on the double random principle. Disqualified enterprises and projects must make rectifications to meet relevant requirements.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.