• Molybdenum Oxide 99.9%min EXW Chinadown(-9000)  11-07|Tungsten APT 88.5%min In warehouse Rotterdamup(20)  11-07|Manganese Ore S.A. 36%min In Qinzhou Portup(1)  11-07|Manganese Ore S.A. 37%min In Qinzhou Portup(1)  11-07|Cadmium Ingot 99.99%min In warehouse Rotterdamdown(-0.05)  11-07|Sodium Molybdate 99%min EXW Chinadown(-5000)  11-07|Cadmium Ingot 99.99%min In warehouse Baltimoredown(-0.05)  11-07|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(14000)  11-07|Yttrium Oxide 99.999%min In warehouse Rotterdamup(3)  11-07|Molybdenum Oxide 57%min In port South Koreadown(-0.6)  11-07|Molybdenum Oxide 57%min In port Indiadown(-0.6)  11-07|Ferro-silicon 75%min In warehouse Rotterdamdown(-30)  11-07|Stainless Bar 304 60mm In warehouse Dainandown(-300)  11-07|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(15000)  11-07
  • 36 coal mines of Shanxi Coking Coal Group resume production as of Feb 10

    2020-02-14 17:47:52   [Print]
    Since the outbreak, Shanxi Coking Coal Group has done a good job in ensuring energy supply and urgently deployed qualified mines to resume work and resume production.

    It is reported that on February 10 alone, 11 coal mines of Shanxi Coking Coal Group resumed production. As of February 10, the group had 36 mines back to production, with raw coal output of 190,000 tons / day and clean coal output of 93,000 tons / day.
    .Asian Metal Copyright It is reported that on February 10 alone, 11 coal mines of Shanxi Coking Coal Group resumed productionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.