• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Tianma Xinglong's vanadium-titanium magnetite project in South Africa starts construction

    2020-02-10 16:42:54   [Print]
    On February 6, 2020, at 12:58 local time in South Africa, Tianma Xinglong's vanadium-titanium magnetite project officially broke ground.

    The construction of the mine will be divided in two phases, and the mine's total annual production capacity of ore is expected to reach 5 million tons within three years.

    The mine is located about 30km north of the town of Mocopane in Limpopo Province, republic of South Africa. The total area of the mine is 69.Asian Metal Copyright The mine is located about 30km north of the town of Mocopane in Limpopo Province, republic of South Africa.Asian Metal Copyright56 square kilometers, and the ore reserves are 5 billion tons.
    .Asian Metal CopyrightOn February 6, 2020, at 12:58 local time in South Africa, Tianma Xinglong's vanadium-titanium magnetite project officially broke groundAsian Metal Copyright
    Ferro-vanadium 50%min Delivered China
    Unit:RMB/mt
    Ferro-vanadium 50%min Delivered China RMB/mt
    China vanadium nitride producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.