• Zinc Conc. 50%min EXW Chinaup(630)  06-03|Tungsten APT 88.5%min EXW Chinaup(20000)  06-03|Gadolinium Oxide 99.5%min EXW Chinadown(-6000)  06-03|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(15)  06-03|LaCe Mischmetal Ce/RE 65%min, Fe 1%max EXW Chinaup(500)  06-03|Vanadium Pentoxide Flake 98%min EXW Chinadown(-2000)  06-03|Ferro-gadolinium 73% EXW Chinadown(-5000)  06-03|LaCe Mischmetal Ce/RE 65%min, Fe 0.3%max EXW Chinaup(500)  06-03|LaCe Carbonate TREO 45%min, CeO2/REO 65±2% EXW Chinaup(50)  06-03|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinaup(15)  06-03|Yttrium Oxide 99.999%min FOB Chinaup(0.7)  06-03|Tungsten Ore WO3 55%min EXW Chinaup(10000)  06-03|Selenium Powder 99.9%min Delivered Chinadown(-5)  06-03|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(150)  06-03
  • Capacity replacement scheme of Chifeng Zhongtang Special Steel project in public

    2020-01-21 17:26:25   [Print]
    On January 17, the Department of Industry and Information Technology of Inner Mongolia Autonomous Region publicized the capacity replacement plan of 2.Asian Metal Copyright Construction project situation EnterpriseName Construction site Name, model and quantity of smelting equipment Capacity conversion 10,000t Planned commencement time Planned production time Replacement proportion Chifeng Zhongtang Special Steel Co.Asian Metal Copyright7 million tpy of fine steel project of Chifeng Zhongtang Special Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright0004:1 Project exit situation No.Asian Metal Copyright The publicity period is five working days from the publicity date.

    Construction project situation

    Enterprise Name

    Construction site

    Name, model and quantity of smelting equipment

    Capacity conversion

    (10,000t)

    Planned commencement time

    Planned

    production

    time

    Replacement proportion

    Chifeng Zhongtang Special Steel Co., Ltd.

    Ningcheng, Chifeng

    Two blast furnaces of 1580 cubic meters

    2.74 million ton

    April 1, 2020

    March 30, 2022

    1.0004:1

    Two 120 ton converters

    2.70 million ton

     

     

    1.0004:1

    Project exit situation

    No.

    Province (District, city)

    Enterprisename

    Name, Model and Quantity of smelting equipment

    Capacity conversion

    (10,000t)

    Removal starting time

    Removal in place time

    Remarks

    1

    TangshanHebei

    Tangshan Jinma Steel Group

    3 × 500m3 blast furnace

    59

    Before the project put into production

    Before the project put into production

     

    2

     

     

    1 × 1080m3 blast furnace

    104

     

     

    Of this total, 1.111 million tons was used to reduce the production capacity of the project, and the remaining 109,000 tons of production capacity was used by Chifeng Zhongtang Special Steel Co.Asian Metal Copyright0004:1 Project exit situation No.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright for other purposes.

    3

     

     

    2 × 1350m3 blast furnace

    122

     

     

    4

    TangshanHebei

    Tangshan Jinma Steel Group

    Two 120t converter    270

     

     

     

     

    Ulanhot,

    Inner Mongolia

    Wulanhaote Steel Co., Ltd.

    Two 35t

    converter

    0.1

    This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co., Ltd.Asian Metal Copyright111 million tons was used to reduce the production capacity of the project, and the remaining 109,000 tons of production capacity was used by Chifeng Zhongtang Special Steel Co.Asian Metal Copyright (Neigong Xinyuan Gong Zi [2019] No.Asian Metal Copyright70 million ton 1.Asian Metal Copyright 136).   

    This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co., Ltd.Asian Metal Copyright for other purposes.Asian Metal Copyright (Neigong Xinyuan Gong Zi [2019] No.Asian Metal Copyright 136.Asian Metal Copyright 136).  

     

     

    Total

    /

    /

    /

    Ironmaking

    285

     /

     /

     /

    Steelmaking

    270.1

     

     




    .Asian Metal Copyright This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel CoAsian Metal Copyright