• Lithium Carbonate 99.5%min FOB South Americaup(0.3)  12-11|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  12-11|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  12-11|Lithium Carbonate 99.5%min Delivered EUup(0.3)  12-11|Lithium Carbonate 99.5%min CIF Chinaup(0.3)  12-11|Ferro-molybdenum 65%min In warehouse USup(1.5)  12-11|Lithium Carbonate 99.5%min Delivered USup(0.3)  12-11|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-60)  12-11|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinaup(13)  12-11|Yttrium Oxide 99.999%min In warehouse Rotterdamup(8)  12-11|Samarium Metal 99.5%min FOB Chinaup(0.3)  12-11|Samarium Oxide 99.9%min FOB Chinaup(50)  12-11|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(10)  12-11|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  12-11
  • Capacity replacement scheme of Chifeng Zhongtang Special Steel project in public

    2020-01-21 17:26:25   [Print]
    On January 17, the Department of Industry and Information Technology of Inner Mongolia Autonomous Region publicized the capacity replacement plan of 2.Asian Metal Copyright, Ltd.Asian Metal Copyright7 million tpy of fine steel project of Chifeng Zhongtang Special Steel Co.Asian Metal Copyright This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright1 .Asian Metal Copyright The publicity period is five working days from the publicity date.

    Construction project situation

    Enterprise Name

    Construction site

    Name, model and quantity of smelting equipment

    Capacity conversion

    (10,000t)

    Planned commencement time

    Planned

    production

    time

    Replacement proportion

    Chifeng Zhongtang Special Steel Co., Ltd.

    Ningcheng, Chifeng

    Two blast furnaces of 1580 cubic meters

    2.74 million ton

    April 1, 2020

    March 30, 2022

    1.0004:1

    Two 120 ton converters

    2.70 million ton

     

     

    1.0004:1

    Project exit situation

    No.

    Province (District, city)

    Enterprisename

    Name, Model and Quantity of smelting equipment

    Capacity conversion

    (10,000t)

    Removal starting time

    Removal in place time

    Remarks

    1

    TangshanHebei

    Tangshan Jinma Steel Group

    3 × 500m3 blast furnace

    59

    Before the project put into production

    Before the project put into production

     

    2

     

     

    1 × 1080m3 blast furnace

    104

     

     

    Of this total, 1.111 million tons was used to reduce the production capacity of the project, and the remaining 109,000 tons of production capacity was used by Chifeng Zhongtang Special Steel Co.Asian Metal Copyright1 This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright for other purposes.

    3

     

     

    2 × 1350m3 blast furnace

    122

     

     

    4

    TangshanHebei

    Tangshan Jinma Steel Group

    Two 120t converter    270

     

     

     

     

    Ulanhot,

    Inner Mongolia

    Wulanhaote Steel Co., Ltd.

    Two 35t

    converter

    0.1

    This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co., Ltd.Asian Metal Copyright Total Ironmaking 285 Steelmaking 270.Asian Metal Copyright (Neigong Xinyuan Gong Zi [2019] No.Asian Metal Copyright 136.Asian Metal Copyright 136).   

    This capacity belongs to the capacity reserved by the demolished equipment after the completion of replacement in the announcement of the Department of industry and information technology of Inner Mongolia Autonomous Region on the steel capacity replacement plan of Ulanhot Steel Co., Ltd.Asian Metal Copyright 136.Asian Metal Copyright (Neigong Xinyuan Gong Zi [2019] No.Asian Metal Copyright The publicity period is five working days from the publicity date.Asian Metal Copyright 136).  

     

     

    Total

    /

    /

    /

    Ironmaking

    285

     /

     /

     /

    Steelmaking

    270.1

     

     




    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.