• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Daqing Yitai to finish construction of gallium arsenide wafer for LED project in late Jan

    2020-01-21 16:14:21   [Print]
    It is reported that the construction of compound semiconductor new materials industrial park phase I project, invested and constructed by Daqing Yitai Semiconductor Materials Co.Asian Metal Copyright4 million pieces, 6-inch gallium arsenide wafer for weak electricity project with an annual capacity of 36,0000 pieces, 2-inch indium phosphide wafer project with an annual capacity of 1.Asian Metal Copyright, Ltd.Asian Metal Copyright, is expected to be completed in late January.Asian Metal Copyright, is expected to be completed in late January.

    The compound semiconductor new materials industrial park project is a key investment attraction project in Daqing City, with an annual output of 2.4 million pieces of 4-inch gallium arsenide for LED in the phase I project, which has entered the stage of installation, debugging and operation at the same time.

    The semiconductor new materials industrial park project is expected to receive an investment of RMB2.1 billion (USD304.Asian Metal Copyright The semiconductor new materials industrial park project is expected to receive an investment of RMB2.Asian Metal Copyright90 million) to build six projects, including 4-inch gallium arsenide wafer for LED project with an annual capacity of 2.Asian Metal Copyright .Asian Metal Copyright4 million pieces, 6-inch gallium arsenide wafer for weak electricity project with an annual capacity of 36,0000 pieces, 2-inch indium phosphide wafer project with an annual capacity of 1.Asian Metal Copyright, Ltd.Asian Metal Copyright2 million pieces, 6-inch silicon carbide wafer project with an annual capacity of 60,000 pieces, 2-inch lithium tantalate wafer project with an annual capacity of 1.Asian Metal Copyright2 million pieces, 6-inch silicon carbide wafer project with an annual capacity of 60,000 pieces, 2-inch lithium tantalate wafer project with an annual capacity of 1.Asian Metal Copyright2 million pieces and compound semiconductor new materials research and development center project.Asian Metal Copyright If all of these projects are put into operation, the annual sales revenue will be RMB2.Asian Metal Copyright If all of these projects are put into operation, the annual sales revenue will be RMB2.Asian Metal CopyrightIt is reported that the construction of compound semiconductor new materials industrial park phase I project, invested and constructed by Daqing Yitai Semiconductor Materials Co.Asian Metal Copyright8 billion (USD406.Asian Metal Copyright The semiconductor new materials industrial park project is expected to receive an investment of RMB2.Asian Metal Copyright54 million).

    .Asian Metal Copyright The compound semiconductor new materials industrial park project is a key investment attraction project in Daqing City, with an annual output of 2Asian Metal Copyright
    Gallium Metal 99.99%min FOB China
    Unit:USD/kg
    Gallium Metal 99.99%min FOB China USD/kg
    China gallium metal producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.