• Yttrium Oxide 99.999%min In warehouse Rotterdamup(15)  12-10|Yttrium Metal 99.9%min FOB Chinaup(1)  12-10|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(25)  12-10|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  12-10|Cadmium Ingot 99.99%min In warehouse Rotterdamdown(-0.05)  12-10|Ferro-molybdenum 60%min In warehouse Russiadown(-80)  12-10|Ferro-molybdenum 65%min In warehouse USup(1.5)  12-10|Antimony Ingot 99.65%min In warehouse Baltimoredown(-0.7)  12-10|Dysprosium Oxide 99.5%min In Warehouse Rotterdamup(30)  12-10|Lithium Manganate Mn 58% Delivered Chinaup(900)  12-10|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinaup(13)  12-10|Cadmium Ingot 99.99%min In warehouse Baltimoredown(-0.05)  12-10|Samarium Metal 99.5%min FOB Chinaup(0.3)  12-10|Samarium Oxide 99.9%min FOB Chinaup(50)  12-10
  • Wu'an releases level-II emergency response measures against heavy air pollution

    2020-01-16 16:56:10   [Print]
    The heavy air pollution emergency command office of Wu'an decided to strengthen level-II emergency response control from 8:00 a.Asian Metal Copyright For iron and steel enterprises, the level-I red alert emergency response shall be executed from 12 a.Asian Metal Copyrightm.Asian Metal CopyrightThe heavy air pollution emergency command office of Wu'an decided to strengthen level-II emergency response control from 8:00 a.Asian Metal Copyright January 16-20 under the premise of ensuring safety production.Asian Metal Copyright .Asian Metal Copyright For iron and steel enterprises, the level-I (red alert) emergency response shall be executed from 12 a.Asian Metal CopyrightThe heavy air pollution emergency command office of Wu'an decided to strengthen level-II emergency response control from 8:00 a.Asian Metal Copyrightm.Asian Metal CopyrightThe heavy air pollution emergency command office of Wu'an decided to strengthen level-II emergency response control from 8:00 a.Asian Metal Copyright January 15-19 with emission reduction intensified and sintering machines and pellet production halted; Coking companies shall extend the coking time for 48 hours.

    .Asian Metal Copyright January 15-19 with emission reduction intensified and sintering machines and pellet production halted; Coking companies shall extend the coking time for 48 hoursAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.