• Copper Conc. TC 25%min CIF Chinadown(-3)  07-11|Polysilicon 9N Delivered Chinaup(2)  07-11|Silicon Metal 4-4-1 Delivered Chinaup(300)  07-11|Silicon Metal 4-2-1 Delivered Chinaup(300)  07-11|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Erbium Oxide 99.5%min EXW Chinaup(9)  07-11|Antimony Ingot 99.65%min In port Indiaup(140)  07-11|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  07-11|Iron Ore Fine Australian 62%min In port Chinaup(20)  07-11|Dysprosium Oxide 99.5%min EXW Chinaup(45)  07-11|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Iron Ore Fine Australian 62%min CNF Chinaup(2.5)  07-11|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-11|Rhenium APR 99.99%min EXW Chinaup(200)  07-11
  • SASAC: Steel and coal production capacity cut completely finished in 2019

    2020-01-16 11:59:12   [Print]
    SASAC spokesman Peng Huagang claimed that supply-side structural reform continued to deepen and the steel and coal capacity reduction task was finished in an all-round way in 2019.

    .Asian Metal CopyrightSASAC spokesman Peng Huagang claimed that supply-side structural reform continued to deepen and the steel and coal capacity reduction task was finished in an all-round way in 2019Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.