• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Capacity transfer scheme for construction project of Henan Jiyuan Iron and Steel

    2020-01-16 16:03:18   [Print]
    On January 13, 2020, Department of Industry and Information Technology of Henan sought public opinions on the capacity transfer scheme for construction project of Henan Jiyuan Iron and Steel (Group) Co.Asian Metal Copyright 4 blast furnaces of 508 cubic meters 239.Asian Metal Copyright, Ltd.Asian Metal Copyright 1 converter of 60t 85 2023 2023 Total 239.Asian Metal Copyright; the publication period is from January 13, 2020 to February 13, 2020.

    Construction Project

    Company

    Location

    Facilities

    Transfer capacity (10kt)

    Proposed construction date

    Proposed operation date

    Transfer ratio

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    Existing plant area

    2 blast furnaces of 1,300 cubic meters

    238.2

    One blast furnace in 2020, one in 2022

    One blast furnace in 2021, one in 2023

    Reduction of 5,000t

    1 converter of 104t

    119

    2022

    2023

    Reduction of 5,000t

    1 alloy steel electric furnace of 55t

    41

    2022

    2023

    Cancelled Projects

    No.

    Location

    Company

    Facilities

    Transfer capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    4 blast furnaces of 508 cubic meters

    239.2

    Two blast furnaces in 2021, the rest in 2023

    Two blast furnaces in 2021, the rest in 2023

    Transferred capacity contains 2.392 million tons of iron-making capacity in total, including 2.Asian Metal Copyright 2 Jiyuan, Henan Henan Jiyuan Iron and Steel Group Co.Asian Metal Copyright382 million tons for construction project, a reduction of 5,000t and the rest of 5,000t for self-use of the company.

    2

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    1 converter of 50t

    76

    2023

    2023

    Transferred capacity contains 1.61 million tons of steel-making capacity in total, including 1.Asian Metal Copyright, Ltd.Asian Metal Copyright60 million tons for construction project, a reduction of 5,000t and the rest of 5,000t for self-use of the company.

    3

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    1 converter of 60t

    85

    2023

    2023

    Total

    /

    /

    /

    239.2 of iron-making; 161 of steel-making

    /

    /

    /



    .Asian Metal Copyright 1 converter of 50t 76 2023 2023 Transferred capacity contains 1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.