• Lithium Carbonate 99.2%min Delivered Chinaup(3600)  01-07|Spodumene Li2O 6%min CIF Chinaup(45)  01-07|Lithium Carbonate 99.5%min FOB South Americaup(0.4)  01-07|Spodumene Li2O 3%min In port Chinaup(45)  01-07|Nickel Cathode Norilsk 99.96%min In port Chinaup(4000)  01-07|Cobalt Oxide 72%min Delivered Chinaup(9)  01-07|Lithium Carbonate 99.5%min Delivered Chinaup(3500)  01-07|Ammonium Tetrathiomolybdate 56%min EXW Chinaup(7000)  01-07|Tin Conc. Burmese 20%min In warehouse MengAup(9000)  01-07|Ammonium Heptamolybdate 54%min EXW Chinaup(7000)  01-07|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.4)  01-07|Tin Conc. Burmese 30%min In warehouse MengAup(9000)  01-07|Ferro-manganese Mn 80%min, C 0.7%max EXW Chinaup(250)  01-07|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.4)  01-07
  • Capacity transfer scheme for construction project of Henan Jiyuan Iron and Steel

    2020-01-16 16:03:18   [Print]
    On January 13, 2020, Department of Industry and Information Technology of Henan sought public opinions on the capacity transfer scheme for construction project of Henan Jiyuan Iron and Steel (Group) Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright Existing plant area 2 blast furnaces of 1,300 cubic meters 238.Asian Metal Copyright; the publication period is from January 13, 2020 to February 13, 2020.

    Construction Project

    Company

    Location

    Facilities

    Transfer capacity (10kt)

    Proposed construction date

    Proposed operation date

    Transfer ratio

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    Existing plant area

    2 blast furnaces of 1,300 cubic meters

    238.2

    One blast furnace in 2020, one in 2022

    One blast furnace in 2021, one in 2023

    Reduction of 5,000t

    1 converter of 104t

    119

    2022

    2023

    Reduction of 5,000t

    1 alloy steel electric furnace of 55t

    41

    2022

    2023

    Cancelled Projects

    No.

    Location

    Company

    Facilities

    Transfer capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    4 blast furnaces of 508 cubic meters

    239.2

    Two blast furnaces in 2021, the rest in 2023

    Two blast furnaces in 2021, the rest in 2023

    Transferred capacity contains 2.392 million tons of iron-making capacity in total, including 2.Asian Metal Copyright Location Company Facilities Transfer capacity 10kt Demolition start date Demolition completion date Note 1 Jiyuan, Henan Henan Jiyuan Iron and Steel Group Co.Asian Metal Copyright382 million tons for construction project, a reduction of 5,000t and the rest of 5,000t for self-use of the company.

    2

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    1 converter of 50t

    76

    2023

    2023

    Transferred capacity contains 1.61 million tons of steel-making capacity in total, including 1.Asian Metal Copyright, Ltd.Asian Metal Copyright60 million tons for construction project, a reduction of 5,000t and the rest of 5,000t for self-use of the company.

    3

    Jiyuan, Henan

    Henan Jiyuan Iron and Steel (Group) Co., Ltd.

    1 converter of 60t

    85

    2023

    2023

    Total

    /

    /

    /

    239.2 of iron-making; 161 of steel-making

    /

    /

    /



    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.