• Antimony Trioxide 99.5%min Delivered Chinaup(10000)  11-20|Spodumene Li2O 3%min In port Chinaup(30)  11-20|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-20|Spodumene Li2O 6%min CIF Chinaup(30)  11-20|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-20|Samarium Cobalt 30H EXW Chinaup(7)  11-20|Cobalt Metal 99.8%min Delivered Chinaup(10)  11-20|Sodium Pyroantimonate 58.4% Delivered Chinaup(2000)  11-20|Yttrium Oxide 99.999%min In warehouse Rotterdamup(3)  11-20|Antimony Ingot 99.65%min In warehouse Rotterdamdown(-1000)  11-20|Coking Coal A 10.5%max, S 0.8%max EXW Shanxidown(-40)  11-20|Spodumene Li2O 5%min In port Chinaup(30)  11-20|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  11-20|Silicon Metal 4-4-1 Ex-VAT FOB Chinaup(30)  11-20
  • Capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group

    2020-01-15 17:02:57   [Print]
    On January 13, 2020, Department of Industry and Information Technology of Hebei sought public opinions on the capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group Co.Asian Metal Copyright; the publication period is from January 13, 2020 to February 12, 2020.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright (the announcement of capacity transfer scheme for Hebei Xinda Iron and Steel Co.Asian Metal Copyright 2# 120t converter 28.Asian Metal Copyright, Ltd.Asian Metal Copyright After correction, the capacity is 588,200t.Asian Metal Copyright that was released on December 3, 2019 was abolished.Asian Metal Copyright Total 143.Asian Metal Copyright); the publication period is from January 13, 2020 to February 12, 2020.

    Construction of Project

    Company

    Location

    Facilities

    Transfer capacity (10kt)

    Proposed construction date

    Proposed operation date

    Transfer ratio

    Hebei Xinda Iron and Steel Group Co., Ltd.

    Plant area of Hebei Xinda Iron and Steel Group

    1 converter of 100t

    115

    October 2019

    June 2020

    1.25:1

    Cancelled Projects

    No.

    Location

    Company

    Facilities

    Transfer capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

    Tangshan

    Hebei Xinda Iron and Steel Group Co., Ltd.

    2# 80t converter

    15

    Before operation of new project

    Before operation of new project

    The rest of 850,000t capacity will be used in capacity transfer in future

    2

    Tangshan

    Hebei Xinda Iron and Steel Group Co., Ltd.

    3# 80t converter

    100

    Before operation of new project

    Before operation of new project

     

    7

    Langfang

    Bazhou Xinli Iron and Steel Co., Ltd.

    2# 120t converter

    28.75

    Before operation of new project

    Before operation of new project

    The purchased capacity was 610,000t in the contract. After correction, the capacity is 588,200t.Asian Metal Copyright the announcement of capacity transfer scheme for Hebei Xinda Iron and Steel Co.Asian Metal Copyright The rest of 300,700t will be used in capacity transfer in future.

    Total

     

     

     

    143.75

     

     

     


    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.