• Ferro-molybdenum 65%min In warehouse USup(2.2)  02-09|Spodumene Li2O 6%min CIF Chinadown(-60)  02-09|Bastnaesite TREO 70%min EXW Chinaup(1300)  02-09|Cobalt Metal 99.8%min Delivered Chinaup(12)  02-09|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(22000)  02-09|Ferro-vanadium 50%min In warehouse Russiaup(28)  02-09|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2800)  02-09|Spodumene Li2O 3%min In port Chinadown(-60)  02-09|NdFeB Sintered Rough N35 Block EXW Chinaup(5)  02-09|Ferro-molybdenum 60%min In port South Koreaup(1.7)  02-09|Ferro-molybdenum 65%min In warehouse Rotterdamup(1.7)  02-09|Neodymium Oxide 99.5%min EXW Chinaup(23000)  02-09|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinadown(-13)  02-09|Praseodymium Oxide 99.5%min EXW Chinaup(23000)  02-09
  • Capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group

    2020-01-15 17:02:57   [Print]
    On January 13, 2020, Department of Industry and Information Technology of Hebei sought public opinions on the capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright (the announcement of capacity transfer scheme for Hebei Xinda Iron and Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal CopyrightOn January 13, 2020, Department of Industry and Information Technology of Hebei sought public opinions on the capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group Co.Asian Metal Copyright that was released on December 3, 2019 was abolished.Asian Metal Copyright 2# 120t converter 28.Asian Metal Copyright); the publication period is from January 13, 2020 to February 12, 2020.

    Construction of Project

    Company

    Location

    Facilities

    Transfer capacity (10kt)

    Proposed construction date

    Proposed operation date

    Transfer ratio

    Hebei Xinda Iron and Steel Group Co., Ltd.

    Plant area of Hebei Xinda Iron and Steel Group

    1 converter of 100t

    115

    October 2019

    June 2020

    1.25:1

    Cancelled Projects

    No.

    Location

    Company

    Facilities

    Transfer capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

    Tangshan

    Hebei Xinda Iron and Steel Group Co., Ltd.

    2# 80t converter

    15

    Before operation of new project

    Before operation of new project

    The rest of 850,000t capacity will be used in capacity transfer in future

    2

    Tangshan

    Hebei Xinda Iron and Steel Group Co., Ltd.

    3# 80t converter

    100

    Before operation of new project

    Before operation of new project

     

    7

    Langfang

    Bazhou Xinli Iron and Steel Co., Ltd.

    2# 120t converter

    28.75

    Before operation of new project

    Before operation of new project

    The purchased capacity was 610,000t in the contract. After correction, the capacity is 588,200t.Asian Metal CopyrightOn January 13, 2020, Department of Industry and Information Technology of Hebei sought public opinions on the capacity transfer scheme for steel-making construction project of Hebei Xinda Iron and Steel Group Co.Asian Metal Copyright The rest of 300,700t will be used in capacity transfer in future.

    Total

     

     

     

    143.75

     

     

     


    .Asian Metal Copyright Construction of Project Company Location Facilities Transfer capacity 10kt Proposed construction date Proposed operation date Transfer ratio Hebei Xinda Iron and Steel Group CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.