• Tungsten Ore WO3 55%min EXW Chinaup(15000)  01-19|Tungsten APT 88.5%min In warehouse Rotterdamup(30)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(34)  01-19|Tungsten Ore WO3 65%min EXW Chinaup(15000)  01-19|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(35)  01-19|Tungsten Bar W-4 99.9%min EXW Chinaup(35)  01-19|Ferro-tungsten 75%min In warehouse Rotterdamup(4)  01-19|Lithium Carbonate 99.2%min Delivered Chinadown(-4600)  01-19|Lithium Carbonate 99.5%min Delivered Chinadown(-4600)  01-19|Cobalt Metal 99.8%min Delivered Chinadown(-13)  01-19|Ferro-tungsten 75%min EXW Chinaup(20000)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(5)  01-19|Tungsten APT 88.5%min EXW Chinaup(20000)  01-19|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  01-19
  • Energy China TEPC wins bid for civil engineering at Timok copper mine in Serbia

    2020-01-14 15:41:41   [Print]
    On January 6, Tianjin Electric Power Construction Co.Asian Metal Copyright The Timok Mine is a Cu Au ore body with different ore types associated with the upper and lower genesis.Asian Metal Copyright, Ltd.Asian Metal Copyright TEPC, a wholly-owned subsidiary of China Energy Engineering Group Co.Asian Metal Copyright (TEPC), a wholly-owned subsidiary of China Energy Engineering Group Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, won the bid for civil engineering, which includes the construction of a power substation, at Timok Copper & Gold Mine located in Serbia and owned by China's Zijin Mining.

    Timok Copper & Gold Mine is located in eastern Serbia and about 5km away from Bor, the country's regional administration center and mining center. The Timok Mine is a Cu & Au ore body with different ore types associated with the upper and lower genesis.Asian Metal Copyright .Asian Metal Copyright The upper mine is a high-grade massive gold & copper deposit and the lower part is a world-class super-large porphyry copper deposit.Asian Metal Copyright The Timok Mine is a Cu Au ore body with different ore types associated with the upper and lower genesis.Asian Metal Copyright With a designed annual processing capacity of 3.Asian Metal Copyright With a designed annual processing capacity of 3.Asian Metal Copyright3 million tonnes of ore, the project is expected to produce more than 79,000 tonnes of copper in concentrate per year upon completion of construction.

    .Asian Metal Copyright TEPC, a wholly-owned subsidiary of China Energy Engineering Group CoAsian Metal Copyright
    Copper Conc. TC 25%min CIF China
    Unit:USD/mt
    Copper Conc. TC 25%min CIF China USD/mt
    China copper concentrate producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.