• Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(10000)  01-14|Tin Conc. Burmese 20%min In warehouse MengAup(20000)  01-14|Tin Conc. Burmese 30%min In warehouse MengAup(20000)  01-14|Tin Conc. 60%min Delivered Chinaup(20000)  01-14|Tin Ingot 99.95%min EXW Chinaup(20000)  01-14|Spodumene Li2O 6%min CIF Chinaup(100)  01-14|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Tin Solder Bar Sn 60%min, Pb 39%max EXW Chinaup(12)  01-14|Lithium Carbonate 99.2%min Delivered Chinaup(7000)  01-14|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(8)  01-14|Lithium Carbonate 99.5%min Delivered Chinaup(7000)  01-14|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(20)  01-14|Ferro-holmium 80% EXW Chinaup(15)  01-14|Lithium Metal 99.9%min Delivered Chinaup(23000)  01-14
  • Shanxi Hongda Steel Group implements capacity reduction replacement plan

    2020-01-10 18:01:48   [Print]
    On January 9, the Department of Industry and Information Technology of Shanxi announced the capacity reduction replacement plan of Shanxi Hongda Steel Group Co.Asian Metal Copyright 1 × 60t converter 85 three months before 2 × 100t converter was put into operation before 2 × 100t converter was put into operation After a reduction of 1.Asian Metal Copyright, Ltd.

    Construction projects

    Enterprise name

    Construction address

    Equipment name, model and quantity

    Conversion capacity (10000 tons)

    Planned start time

    Planned production time

    Replacement proportion

    Shanxi Hongda iron and Steel Group

    Xiaozhang village, Senglou Town, Hejin City, Yuncheng City, Shanxi Province

    2 × 100t converter

    230

    October 2019

    December 2020

    1.008:1

    Exit capacity

    No.

    Province(district)

    Enterprise Name

    Equipment name, model and quantity conversion capacity (10000 tons)

    Conversion capacity (10,000 tons)

    Time to start demolition

    Time to dismantle in place

    Others

    1

    Yuncheng, Shanxi

    Shanxi Hongda iron and Steel Group Co., Ltd.

    1 × 60t converter

    85

      three months before 2 × 100t converter  was put into operation

    before 2 × 100t converter  was put into operation

    After a reduction of 1.008: 1, the actual capacity will be reduced by 20,000 tons, and the remaining 30,000 tons will be used for other capacity replacement projects.

    1 × 120t converter

    135

    2

    Jincheng, Shanxi

    Jincheng Fusheng Steel Co., Ltd

    1 × 100t converter replace remaining capacity

    15