• Praseodymium Oxide 99.5%min EXW Chinadown(-25000)  04-23|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinadown(-28000)  04-23|Graphitized Pet Coke C 98.5%min, S 0.5%max, 1-5mm EXW Chinadown(-100)  04-23|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinadown(-23000)  04-23|LaCe Mischmetal Ce/RE 65%min, Fe 1%max EXW Chinaup(500)  04-23|Mercury Metal 99.9%min Ex-VAT EXW Chinaup(50)  04-23|Neodymium Oxide 99.5%min EXW Chinadown(-23000)  04-23|Mercury Metal 99.999%min Ex-VAT EXW Chinaup(50)  04-23|Graphitized Pet Coke C 98.5%min, S 0.05%max, 1-5mm EXW Chinadown(-100)  04-23|Neodymium Oxide 99.5%min FOB Chinadown(-3000)  04-23|Praseodymium Oxide 99.5%min FOB Chinadown(-3000)  04-23|Tantalum Conc. Ta2O5 30%min CIF Chinadown(-5)  04-23|Calcined Pet Coke S 3%max EXW Chinadown(-100)  04-23|CR Coil SPCC 1.0mm FOB Chinaup(12)  04-23
  • Shanxi Hongda Steel Group implements capacity reduction replacement plan

    2020-01-10 18:01:48   [Print]
    On January 9, the Department of Industry and Information Technology of Shanxi announced the capacity reduction replacement plan of Shanxi Hongda Steel Group Co.Asian Metal Copyright008: 1, the actual capacity will be reduced by 20,000 tons, and the remaining 30,000 tons will be used for other capacity replacement projects.Asian Metal Copyright, Ltd.

    Construction projects

    Enterprise name

    Construction address

    Equipment name, model and quantity

    Conversion capacity (10000 tons)

    Planned start time

    Planned production time

    Replacement proportion

    Shanxi Hongda iron and Steel Group

    Xiaozhang village, Senglou Town, Hejin City, Yuncheng City, Shanxi Province

    2 × 100t converter

    230

    October 2019

    December 2020

    1.008:1

    Exit capacity

    No.

    Province(district)

    Enterprise Name

    Equipment name, model and quantity conversion capacity (10000 tons)

    Conversion capacity (10,000 tons)

    Time to start demolition

    Time to dismantle in place

    Others

    1

    Yuncheng, Shanxi

    Shanxi Hongda iron and Steel Group Co., Ltd.

    1 × 60t converter

    85

      three months before 2 × 100t converter  was put into operation

    before 2 × 100t converter  was put into operation

    After a reduction of 1.008: 1, the actual capacity will be reduced by 20,000 tons, and the remaining 30,000 tons will be used for other capacity replacement projects.

    1 × 120t converter

    135

    2

    Jincheng, Shanxi

    Jincheng Fusheng Steel Co., Ltd

    1 × 100t converter replace remaining capacity

    15



    .Asian Metal Copyright008:1 Exit capacity NoAsian Metal Copyright