• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Level-II emergency response to severe pollution relieved in Tangshan

    2020-01-07 16:59:16   [Print]
    Tangshan Municipal People's government announced that on January 6, affected by cold air, the diffusion conditions gradually improved and the pollution basically ended.Asian Metal CopyrightTangshan Municipal People's government announced that on January 6, affected by cold air, the diffusion conditions gradually improved and the pollution basically ended.Asian Metal Copyright The heavy pollution weather response headquarters in Tangshan decided to lift the level II emergency response to heavy pollution weather in Tangshan from 8:00 on January 7.

    The announcement mentioned that Tangshan will continue to implement various emission reduction measures in accordance with the plan for strengthening air pollution control in January.

    .Asian Metal CopyrightTangshan Municipal People's government announced that on January 6, affected by cold air, the diffusion conditions gradually improved and the pollution basically endedAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.