• Tungsten Ore WO3 55%min EXW Chinaup(15000)  01-19|Tungsten APT 88.5%min In warehouse Rotterdamup(30)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(34)  01-19|Tungsten Ore WO3 65%min EXW Chinaup(15000)  01-19|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(35)  01-19|Tungsten Bar W-4 99.9%min EXW Chinaup(35)  01-19|Ferro-tungsten 75%min In warehouse Rotterdamup(4)  01-19|Lithium Carbonate 99.2%min Delivered Chinadown(-4600)  01-19|Lithium Carbonate 99.5%min Delivered Chinadown(-4600)  01-19|Cobalt Metal 99.8%min Delivered Chinadown(-13)  01-19|Ferro-tungsten 75%min EXW Chinaup(20000)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(5)  01-19|Tungsten APT 88.5%min EXW Chinaup(20000)  01-19|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  01-19
  • Capacity transfer scheme for high-quality special steel structure adjustment project of Lanxin Iron and Steel Group

    2020-01-07 16:53:15   [Print]
    On January 6, 2020, Department of Industry and Information Technology of Gansu sought public opinions on the capacity transfer scheme for high-quality special steel structure adjustment project of Lanxin Iron and Steel Group Co.Asian Metal Copyright5 for the construction party of the project 2020 December 2020 Http:gxt.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright and the publication time is from January 6, 2020 to January 10, 2020.

    Project for construction

    Company

    Social credit No.

    Location

    Facilities

    Capacity (10kt)

    Proposed start time

    Proposed operation time

    Transfer ratio

    Lanxin Iron and Steel Group Co., Ltd.

    91620122710223188P

    Heishi Industrial Park, Gaolan, Lanzhou, Gansu

    1 alloy steel electric furnace of 50t

    36

    After put into record

    December 2020

    Transfer with reduction of 100t and the rest of 44,900t is left for the use of the company

    Cancelled project

    Location

    Company

    Social credit No.

    Facilities

    Capacity (10kt)

    Demolition start time

    Demolition completion time

    Note

    Xingtai, Hebei

    Xingtai Iron and Steel Co., Ltd.

    91130500105783910L

    1 converter of 50t

    76 in total, including 40.5 for the construction party of the project

    2020

    December 2020

    Http://gxt.hebei.Asian Metal Copyright Project for construction Company Social credit No.Asian Metal Copyrightgov.cn/hbgyhxxht/xwzx32/tzgg83/661587/index.html


    .Asian Metal Copyright 91130500105783910L 1 converter of 50t 76 in total, including 40Asian Metal Copyright