• Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-50)  07-02|Ferro-boron B 18%min FOB Chinaup(100)  07-02|Selenium Dioxide 98%min Delivered Chinadown(-4)  07-02|Met. Coke A 13%max, S 0.7%max EXW Shanxiup(55)  07-02|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(55)  07-02|Ferro-vanadium 80%min IW Pittsburghdown(-1)  07-02|Ilmenite Conc 46%min Ex-VAT EXW Chinadown(-40)  07-02|Antimony Conc. 50%min Delivered Chinadown(-3000)  07-02|Sodium Pyroantimonate 58.4% Delivered Chinadown(-1500)  07-02|Met. Coke A 13%max, S 0.7%max EXW Shandongup(55)  07-02|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinadown(-5)  07-02|Tungsten Oxide WO3 99.95%min EXW Chinadown(-20000)  07-02|Ilmenite Conc 52%min CIF Chinadown(-5)  07-02|Ethylene Glycol Antimony 57%min Delivered Chinadown(-2000)  07-02
  • Xichang Steel Vanadium completes annual plan by 96.9%

    2019-12-06 17:29:19   [Print]
    From January to November, Xichang Steel Vanadium produced 4,367.Asian Metal Copyright .Asian Metal Copyright19kt of iron, completing 96.Asian Metal Copyright19kt of iron, completing 96.Asian Metal Copyright9% of the annual plan with the capacity rising by 12.Asian Metal Copyright19kt of iron, completing 96.Asian Metal Copyright8% YOY.Asian Metal Copyright19kt of iron, completing 96.Asian Metal Copyright The utilization coefficient of blast furnaces and other major technical indicators all reached the best level since the production start.

    .Asian Metal Copyright9% of the annual plan with the capacity rising by 12Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.