• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-15)  09-18|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-18|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.4)  09-18|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-18|Tungsten APT 88.5%min FOB Chinaup(15)  09-18|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-18|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-18|Bismuth Oxide 99.9%min EXW Chinaup(3000)  09-18|Germanium Metal 99.99%min Delivered Europeup(100)  09-18|Germanium Metal 99.99%min Delivered USup(100)  09-18|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurdown(-50)  09-18|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-50)  09-18
  • Jindal Steel to lift output amid increased demand

    2019-11-28 15:44:16   [Print]
    India's Jindal Power and Steel (JSPL) plans to raise its crude steel output to 8.Asian Metal Copyright .Asian Metal Copyright5mn tons during the 2020-21 fiscal year ending 31 March on expectation of increased demand from infrastructure projects.

    JSPL expects to produce 6mn tons of crude steel in 2019-20, JSPL managing director VR Sharma said.

    The company in April refurbished its blast furnace at it's 6mn t/y Angul works in east India's Odisha state. The refurbished furnace is expected to produce 9,200 t/d of pig iron in 2020-21, up from current output of 7,000 t/d.

    The company expects to increase its total supply of rail for domestic and global orders by 17% to 700,000t in 2020-21 from 600,000t in 2019-20. JSPL operates a 1mn t/y rail steel mill at its 3.6mn t/y integrated steel plant at Raigarh in east India's Chhattisgarh state.

    .Asian Metal Copyright JSPL expects to produce 6mn tons of crude steel in 2019-20, JSPL managing director VR Sharma saidAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.