• Zinc Conc. TC 50%min CIF Chinadown(-10)  10-31|Chromium Oxide Green 99%min EXW Chinaup(1000)  10-31|Chromium Metal 99%min FOB Chinaup(300)  10-31|Chromium Metal 99%min EXW Chinaup(2000)  10-31|Calcined Pet Coke S 3%max EXW Chinaup(100)  10-31|NCM 613 Delivered Chinaup(2600)  10-31|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinadown(-10)  10-31|Cobalt Powder 99.5%min Delivered Chinaup(12)  10-31|NCM 8312 Delivered Chinaup(3000)  10-31|Coking Coal A 10%max, S 0.8%max EXW Henanup(40)  10-31|Cobalt Metal 99.8%min Delivered Chinadown(-10)  10-31|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinadown(-10)  10-31|Chromic Anhydride 99.8%min EXW Chinaup(500)  10-31|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  10-31
  • Yuguang Tongda Mining puts Hucaoping vanadium base phase I project into pilot operation

    2019-11-21 13:35:46   [Print]
    On 13 November, 2019 Shangluo major projects construction site observation meeting was held in Shangnan.Asian Metal Copyright59 million and a taxable income of RMB30 million USD4.Asian Metal Copyright Participants visited three projects, including Shangnan Yuguang Tongda Mining's Hucaoping vanadium base.

    Located in Yaoling Village, Zhaochuan Town, Yuguang Tongda Mining's Hucaoping vanadium base is invested and constructed by Yuguang Tongda Shangnan Hucaoping Mineral Development Co., Ltd.Asian Metal Copyright Covering a planned area of 20mu and owning an investment of RMB200 million USD28.Asian Metal Copyright Covering a planned area of 28mu and owning an investment of RMB320 million (USD45.Asian Metal Copyright Presently, the phase I project with an annual production capacity of 2,000 tons of vanadium pentoxide has been put into pilot operation.Asian Metal Copyright43 million), the phase I project will take advantage of the carbon content of stone coal vanadium ore and adopt the most advanced spontaneous combustion roasting, acid pickling vanadium precipitation and dedusting desulfurization processes to build a 2,000-ton-per-annum vanadium pentoxide production line with a daily handling capacity of 1,000 tons of vanadium ore and a vanadium leaching rate of over 85%.Asian Metal Copyright Located in Yaoling Village, Zhaochuan Town, Yuguang Tongda Mining's Hucaoping vanadium base is invested and constructed by Yuguang Tongda Shangnan Hucaoping Mineral Development Co.Asian Metal Copyright Covering a planned area of 20mu and owning an investment of RMB200 million (USD28.Asian Metal Copyright After reaching the design capacity and efficiency, the project can have an annual production value of RMB300 million USD42.Asian Metal Copyright39 million), the phase II project will build one vanadium slag comprehensive utilization production line with an annual handling capacity of 200,000 tons, one vanadium alloy production line with an annual production capacity of 4,000 tons and one vanadium nitride production line with an annual production capacity of 2,000 tons to develop and produce vanadium nitride and other downstream products.

    Presently, the phase I project with an annual production capacity of 2,000 tons of vanadium pentoxide has been put into pilot operation. After reaching the design capacity and efficiency, the project can have an annual production value of RMB300 million (USD42.Asian Metal Copyright59 million and a taxable income of RMB30 million USD4.Asian Metal Copyright59 million) and a taxable income of RMB30 million (USD4.Asian Metal Copyright After reaching the design capacity and efficiency, the project can have an annual production value of RMB300 million USD42.Asian Metal Copyright26 million).

    .Asian Metal Copyright Participants visited three projects, including Shangnan Yuguang Tongda Mining's Hucaoping vanadium baseAsian Metal Copyright
    Vanadium Pentoxide Flake 98%min EXW China
    Unit:RMB/mt
    Vanadium Pentoxide Flake 98%min EXW China RMB/mt
    China vanadium pentoxide flake producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.