• Pet Coke S 3%max EXW Chinaup(100)  09-17|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-17|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-12)  09-17|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-12)  09-17|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-17|Nickel Sulfate Ni 22%min; Co 0.05%max Delivered Chinaup(800)  09-17|Tungsten APT 88.5%min FOB Chinaup(15)  09-17|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(2.5)  09-17|Tungsten Oxide WO3 99.95%min FOB Chinaup(15)  09-17|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-12)  09-17|Tungsten Bar W-4 99.9%min FOB Chinaup(2.5)  09-17|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-17|Cobalt Powder 99.5%min Delivered Chinaup(8)  09-17|Ferro-tungsten 75%min FOB Chinaup(2)  09-17
  • Anglo American updates 2019-2021 iron ore production guidance

    2019-11-13 14:05:37   [Print]
    Anglo American plc provided updated 2019-2021 production guidance for its iron ore businesses, as well as a new guidance for 2022.

    For Minas-Rio, Anglo American now forecasts fiscal 2019 iron ore production of about 23 million tonnes, compared to the prior range of 20 million to 22 million tonnes.

    For fiscal 2020, Minas-Rio iron ore production is now forecast to be 22 million to 24 million tonnes, up from the prior range of 21 million to 23 million tonnes. For fiscal 2021, Minas-Rio iron ore production is now projected to be 24 million to 26 million tonnes, up from the prior range of 22 million to 24 million tonnes.

    For Kumba Iron Ore, Anglo American maintains its 2019 production outlook at 42 million to 43 million tonnes. For both fiscal 2020 and 2021, the company updates its production outlook to a range of 43 million to 44 million tonnes from the prior range of 43 million to 45 million tonnes.

    .Asian Metal Copyright For Kumba Iron Ore, Anglo American maintains its 2019 production outlook at 42 million to 43 million tonnesAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.