• Lead Conc. Pb 50%min, Ag 500g/dt max EXW China TCdown(-100)  08-26|Lead Conc. Pb 50%min, Ag 1,000g/dt max EXW China TCdown(-100)  08-26|Lead Conc. Pb 50%min, Ag 200g/dt max EXW China TCdown(-100)  08-26|Germanium Dioxide 99.99%min EXW Chinaup(500)  08-26|Yttrium Oxide 99.999%min IW Rotterdamup(20)  08-26|Coal Tar Pitch Coking Value 56%min EXW Chinaup(150)  08-26|Gadolinium Oxide 99.99%min IW Baltimoreup(8)  08-26|Ferro-tungsten 75%min FOB Chinadown(-5)  08-26|Erbium Oxide 99.5%min IW Rotterdamup(3)  08-26|Silicon Metal 5-5-3 In port Indiaup(3)  08-26|Silicon Metal 4-4-1 In port Indiaup(3)  08-26|Germanium Metal 99.99%min EXW Chinaup(550)  08-26|Cobalt Intermediate 30-40% CIF Chinadown(-0.5)  08-26|Magnesia D.B. 90%min 0-3mm EXW Chinaup(20)  08-26
  • Jincheng issues 2019-2020 autumn/winter comprehensive air pollution control action plan

    2019-10-30 17:40:52   [Print]
    Jincheng government recently issued an action plan on the comprehensive air pollution control for autumn and winter 2019-2020.

    The plan calls for a structure adjustment in heavy-pollution industry. By the end of December 2019, five casting companies are required to complete relocation to new sites; coal production capacity of 2.Asian Metal Copyright In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standards.Asian Metal Copyright85 million tonnes per year should be reduced; coking capacity of 400,000tpy should be cut according to another action plan released by Shanxi government; a detailed action plan on cutting down excessive coking capacity in Jincheng should also be made.

    The plan also promotes the upgrade of traditional industrial clusters, including casting, refractory, ferroalloy, carbon, coal washing and so on. Relevant industries shall set concrete goals for the upgrade.

    In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standards. A policy incentive mechanism will be set for companies that meet the standards after assessment.

    Other requirements include a comprehensive control on air pollution from industrial furnaces and kilns, a faster construction of special railway line, as well as a substantial increase in cargo volume by rail.

    .Asian Metal Copyright In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standardsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.