• Copper Conc. 25%min CIF China TCdown(-15)  08-11|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(20)  08-11|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinaup(20)  08-11|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinaup(20)  08-11|Monazite TREO 54%min In port Chinadown(-1500)  08-11|Erbium Oxide 99.5%min FOB Chinaup(2.5)  08-11|Erbium Oxide 99.5%min IW Rotterdamup(2.5)  08-11|Sodium Tungstate WO3 68%min EXW Chinadown(-15000)  08-11|Ferro-tungsten 75%min IW Rotterdamdown(-5)  08-11|Tungsten Ore WO3 50%min FOB Africaup(50)  08-11|Ilmenite Conc 52%min CIF Chinadown(-5)  08-11|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(150)  08-11|Ferro-tungsten 75%min FOB Chinadown(-5)  08-11|Ferro-gadolinium 73% EXW Chinadown(-5000)  08-11
  • Jincheng issues 2019-2020 autumn/winter comprehensive air pollution control action plan

    2019-10-30 17:40:52   [Print]
    Jincheng government recently issued an action plan on the comprehensive air pollution control for autumn and winter 2019-2020.

    The plan calls for a structure adjustment in heavy-pollution industry. By the end of December 2019, five casting companies are required to complete relocation to new sites; coal production capacity of 2.Asian Metal CopyrightJincheng government recently issued an action plan on the comprehensive air pollution control for autumn and winter 2019-2020.Asian Metal Copyright85 million tonnes per year should be reduced; coking capacity of 400,000tpy should be cut according to another action plan released by Shanxi government; a detailed action plan on cutting down excessive coking capacity in Jincheng should also be made.

    The plan also promotes the upgrade of traditional industrial clusters, including casting, refractory, ferroalloy, carbon, coal washing and so on. Relevant industries shall set concrete goals for the upgrade.

    In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standards. A policy incentive mechanism will be set for companies that meet the standards after assessment.

    Other requirements include a comprehensive control on air pollution from industrial furnaces and kilns, a faster construction of special railway line, as well as a substantial increase in cargo volume by rail.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.