• Ferro-tungsten 75%min EXW Chinadown(-25000)  06-22|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-20)  06-22|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-50)  06-22|Tungsten Oxide WO3 99.95%min EXW Chinadown(-25000)  06-22|Tungsten Oxide WO3 99.95%min FOB Chinadown(-50)  06-22|Ferro-tungsten 70%min EXW Chinadown(-20000)  06-22|Tungsten APT 88.5%min EXW Chinadown(-20000)  06-22|Graphitized Pet Coke C 98.5%min, S 0.05%max, 1-5mm EXW Chinadown(-100)  06-22|Graphitized Pet Coke C 98.5%min, S 0.05%max, 1-5mm FOB Chinadown(-15)  06-22|Antimony Ingot 99.65%min EXW Chinadown(-3000)  06-22|Antimony Ingot 99.85%min EXW Chinadown(-3000)  06-22|Graphitized Pet Coke C 98.5%min, S 0.5%max, 1-5mm EXW Chinadown(-80)  06-22|Zirconium Carbonate Zr(Hf)O2 40%min, Cl 0.2%max EXW Chinaup(500)  06-22|Zirconium Carbonate Zr(Hf)O2 40%min, Cl 50ppm max EXW Chinaup(500)  06-22
  • Jincheng issues 2019-2020 autumn/winter comprehensive air pollution control action plan

    2019-10-30 17:40:52   [Print]
    Jincheng government recently issued an action plan on the comprehensive air pollution control for autumn and winter 2019-2020.

    The plan calls for a structure adjustment in heavy-pollution industry. By the end of December 2019, five casting companies are required to complete relocation to new sites; coal production capacity of 2.Asian Metal Copyright Relevant industries shall set concrete goals for the upgrade.Asian Metal Copyright85 million tonnes per year should be reduced; coking capacity of 400,000tpy should be cut according to another action plan released by Shanxi government; a detailed action plan on cutting down excessive coking capacity in Jincheng should also be made.

    The plan also promotes the upgrade of traditional industrial clusters, including casting, refractory, ferroalloy, carbon, coal washing and so on. Relevant industries shall set concrete goals for the upgrade.

    In addition, iron and steel companies are required to make ultra-low emission transformation through adherence to high standards. A policy incentive mechanism will be set for companies that meet the standards after assessment.

    Other requirements include a comprehensive control on air pollution from industrial furnaces and kilns, a faster construction of special railway line, as well as a substantial increase in cargo volume by rail.

    .Asian Metal Copyright By the end of December 2019, five casting companies are required to complete relocation to new sites; coal production capacity of 2Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.