• Copper Conc. 25%min CIF China TCdown(-5)  05-11|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-300)  05-11|Ferro-tungsten 70%min EXW Chinadown(-30000)  05-11|Tungsten Ore WO3 55%min EXW Chinadown(-20000)  05-11|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinadown(-50)  05-11|Lanthanum Oxide 99.999%min EXW Chinaup(1000)  05-11|Spodumene Li2O 6%min CIF Chinaup(80)  05-11|Ferro-vanadium 80%min IW Pittsburghdown(-1.3)  05-11|Lithium Metal 99%min Delivered Chinaup(30000)  05-11|Germanium Metal 99.99%min EXW Chinaup(500)  05-11|Yttrium Oxide 99.999%min EXW Chinadown(-1800)  05-11|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinadown(-50)  05-11|Met. Coke A 13%max, S 0.7%max EXW Shanxiup(45)  05-11|Caustic Soda 32%min Delivered Chinadown(-70)  05-11
  • Fujian Kaijing puts galvalume plate production line into operation

    2019-10-17 17:07:39   [Print]
    Accordingly to news from Zhangzhou Taiwan investment area, the new technological materials expansion project of Fujian Kaijing Greentech Materials Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright has put its galvalume plate production line into operation.Asian Metal Copyright, Ltd.Asian Metal Copyright The project is located in Fulong Industrial Park of Zhangzhou Taiwan investment area.

    Fujian Kaijing Greentech Materials Co., Ltd.Asian Metal Copyright It is expected that the annual output value for this project would be RMB1 billion USD141 million.Asian Metal Copyright, founded in 1996, is a modern enterprise integrating technology research and development, production and processing, sales and service together for steel products.Asian Metal Copyright It is expected that the annual output value for this project would be RMB1 billion USD141 million.Asian Metal Copyright With the total investment of USD40 million, the project has constructed a galvalume plate production line with annual production capacity of 350,000t.Asian Metal Copyright has put its galvalume plate production line into operation.Asian Metal Copyright It is expected that the annual output value for this project would be RMB1 billion (USD141 million).
    .Asian Metal Copyright The project is located in Fulong Industrial Park of Zhangzhou Taiwan investment areaAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.