• Spodumene Li2O 5%min In port Chinadown(-30)  09-12|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(2.5)  09-12|Tungsten Bar W-4 99.9%min FOB Chinaup(2.5)  09-12|Cobalt Oxide 72%min In warehouse Rotterdamup(0.6)  09-12|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(15000)  09-12|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.3)  09-12|Spodumene Li2O 3%min In port Chinadown(-20)  09-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  09-12|Spodumene Li2O 6%min CIF Chinadown(-20)  09-12|Cobalt Intermediate 30-40% CIF Chinaup(0.3)  09-12|Monazite TREO 54%min In port Chinaup(1000)  09-12|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(13000)  09-12|Cerium Oxide 99.9%min EXW Chinaup(200)  09-12|Arsenic Metal 99.9999%min Delivered Chinaup(5)  09-12
  • Shandong government unveils production capacity replacement plan for Taishan Steel Group

    2019-10-12 17:55:09   [Print]
    On October 11, Department of Industry and Information Technology of Shandong Province unveiled and invited public review on the production capacity replacement plan for Shandong Taishan Steel Group.Asian Metal Copyright The review period will last from October 11 to November 7, 2019.Asian Metal Copyright The review period will last from October 11 to November 7, 2019.

    Project to be constructed

    Company

    Construction

    site

    Specifics on equipment to be constructed

    Production capacity to be built

    (10k tons)

    Planned construction  commencement time

    Planned operation time

    Replacement ratio

    Shandong Taishan Steel Group

    Jinan city

    Two revolving furnaces of 117t

    264

    2019

    2022

    To-be-built capacity should not excel to-be-replaced capacity

    Projects to be replaced

    No.

    Province

    Company

    Specifics on equipment to be replaced

    Production capacity to be replaced

    (10k tons)

    Planned dismantling  commencement time

    Planned dismantling  completion time

    Notes

    1

    Shandong province

    Shandong Taishan Steel Group

    Two revolving furnaces of 60t, and one revolving furnace of 70t

    265

    Before the to-be-built project is completely built

    Before the to-be-built project is completely built

    There will be a crude steel production capacity of 10,000t left, of which 1,000t will be used for the to-be-built project and 9,000t for the company's own 400 series stainless steel project.

    .Asian Metal Copyright Province Company Specifics on equipment to be replaced Production capacity to be replaced 10k tons Planned dismantling commencement time Planned dismantling completion time Notes 1 Shandong province Shandong Taishan Steel Group Two revolving furnaces of 60t, and one revolving furnace of 70t 265 Before the to-be-built project is completely built Before the to-be-built project is completely built There will be a crude steel production capacity of 10,000t left, of which 1,000t will be used for the to-be-built project and 9,000t for the company's own 400 series stainless steel projectAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.