On October 11, Department of Industry and Information Technology of Shandong Province unveiled and invited public review on the production capacity replacement plan for Shandong Taishan Steel Group
.Asian Metal Copyright
Project to be constructed
Company
Construction
site
Specifics on equipment to be constructed
Production capacity to be built
10k tons
Planned construction commencement time
Planned operation time
Replacement ratio
Shandong Taishan Steel Group
Jinan city
Two revolving furnaces of 117t
264
2019
2022
To-be-built capacity should not excel to-be-replaced capacity
Projects to be replaced
No.
Asian Metal Copyright The review period will last from October 11 to November 7, 2019.
| Project to be constructed
|
| Company
|
Construction
site
|
Specifics on equipment to be constructed
|
Production capacity to be built
(10k tons)
|
Planned construction commencement time
|
Planned operation time
|
Replacement ratio
|
| Shandong Taishan Steel Group
|
Jinan city
|
Two revolving furnaces of 117t
|
264
|
2019
|
2022
|
To-be-built capacity should not excel to-be-replaced capacity
|
| Projects to be replaced
|
| No.
|
Province
|
Company
|
Specifics on equipment to be replaced
|
Production capacity to be replaced
(10k tons)
|
Planned dismantling commencement time
|
Planned dismantling completion time
|
Notes
|
| 1
|
Shandong province
|
Shandong Taishan Steel Group
|
Two revolving furnaces of 60t, and one revolving furnace of 70t
|
265
|
Before the to-be-built project is completely built
|
Before the to-be-built project is completely built
|
There will be a crude steel production capacity of 10,000t left, of which 1,000t will be used for the to-be-built project and 9,000t for the company's own 400 series stainless steel project.
|
.Asian Metal Copyright
Province
Company
Specifics on equipment to be replaced
Production capacity to be replaced
10k tons
Planned dismantling commencement time
Planned dismantling completion time
Notes
1
Shandong province
Shandong Taishan Steel Group
Two revolving furnaces of 60t, and one revolving furnace of 70t
265
Before the to-be-built project is completely built
Before the to-be-built project is completely built
There will be a crude steel production capacity of 10,000t left, of which 1,000t will be used for the to-be-built project and 9,000t for the company's own 400 series stainless steel projectAsian Metal Copyright