• Ferro-molybdenum 65%min In warehouse Rotterdamup(2.7)  01-06|Ferro-molybdenum 60%min In port South Koreaup(2.7)  01-06|Copper Conc. 20%min Delivered Chinaup(3500)  01-06|Copper Cathode 99.99%min Delivered Chinaup(3500)  01-06|Lithium Metal 99%min Delivered Chinaup(20000)  01-06|Nickel Cathode Norilsk 99.96%min In port Chinaup(4000)  01-06|Aluminum Ingot 99.7%min In warehouse Wuxiup(690)  01-06|Antimony Ingot 99.65%min In port Indiadown(-100)  01-06|Aluminum Ingot 99.7%min In warehouse Gongyiup(680)  01-06|Lithium Carbonate 99.2%min Delivered Chinaup(3500)  01-06|Aluminum Alloy Ingot A356.2 Delivered Chinaup(680)  01-06|Nickel Sulfate Ni 22%min; Co 0.4%max Delivered Chinaup(800)  01-06|Tin Conc. Burmese 20%min In warehouse MengAup(9000)  01-06|Aluminum Ingot 99.7%min In warehouse Foshanup(680)  01-06
  • Shanghai Baoye Group wins Desheng Stainless Steel's bidding on blast furnace construction project

    2019-10-12 17:54:57   [Print]
    On October 10, Shanghai Baoye Group won the blast furnace construction project of Baosteel Desheng Stainless Steel Co.Asian Metal Copyright241 million tons of melted iron.Asian Metal Copyright, Ltd.Asian Metal Copyright, a subsidiary of China Baowu Steel Group Corporation.Asian Metal Copyright, a subsidiary of China Baowu Steel Group Corporation.

    The project consists of one 2,500m3 blast furnace and its mating facilities, and will an annual production capacity of 2.241 million tons of melted iron.Asian Metal Copyright241 million tons of melted iron.Asian Metal Copyright It will be built in the plant site of Desheng Stainless Steel located in Luoyuan, Fujian, and the construction cycle will last for 497 days.

    .Asian Metal Copyright It will be built in the plant site of Desheng Stainless Steel located in Luoyuan, Fujian, and the construction cycle will last for 497 daysAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.