• Spodumene Li2O 6%min CIF Chinaup(100)  01-12|Lithium Carbonate 99.2%min Delivered Chinaup(6500)  01-12|Lithium Carbonate 99.5%min Delivered Chinaup(6500)  01-12|Copper Scrap Wire 99%min Delivered Chinaup(3000)  01-12|Rhenium APR 99.99%min EXW Chinaup(400)  01-12|Indium Ingot 99.995%min EXW Chinaup(90)  01-12|Spodumene Li2O 5%min In port Chinaup(60)  01-12|Nickel Cathode Norilsk 99.96%min In port Chinaup(4000)  01-12|Dysprosium Oxide 99.5%min EXW Chinaup(40)  01-12|Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1400)  01-12|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(3500)  01-12|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(3)  01-12|Tin Conc. Burmese 20%min In warehouse MengAup(9000)  01-12|Lithium Manganate Mn 58% Delivered Chinaup(1200)  01-12
  • Shanghai Baoye Group wins Desheng Stainless Steel's bidding on blast furnace construction project

    2019-10-12 17:54:57   [Print]
    On October 10, Shanghai Baoye Group won the blast furnace construction project of Baosteel Desheng Stainless Steel Co.Asian Metal Copyright It will be built in the plant site of Desheng Stainless Steel located in Luoyuan, Fujian, and the construction cycle will last for 497 days.Asian Metal Copyright, Ltd.Asian Metal Copyright It will be built in the plant site of Desheng Stainless Steel located in Luoyuan, Fujian, and the construction cycle will last for 497 days.Asian Metal Copyright, a subsidiary of China Baowu Steel Group Corporation.

    The project consists of one 2,500m3 blast furnace and its mating facilities, and will an annual production capacity of 2.241 million tons of melted iron.Asian Metal Copyright241 million tons of melted iron.Asian Metal Copyright It will be built in the plant site of Desheng Stainless Steel located in Luoyuan, Fujian, and the construction cycle will last for 497 days.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.