• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Electric furnace steel-making capacity transfer scheme for Guangdong Jinshenglan Metallurgy Technology

    2019-09-18 17:40:36   [Print]
    On September 11, Department of Industry and Information Technology of Guangdong sought public opinions on the capacity transfer scheme of Guangdong Jinshenglan Metallurgy Technology Co.Asian Metal Copyright 1 converter of 40t 50 Before operation of new project Before operation of new project The total cancelled capacity is 1.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright to build a 150t of electric furnace for steel-making; the publication period is from September 11, 2019 to October 16, 2019.

    Capacity transfer scheme of Guangdong Jinshenglan Metallurgy Technology Co., Ltd. to build a 150t of electric furnace for steel-making

    Construction of Project

    Company

    Location

    Facilities

    Transfer capacity (10kt)

    Proposed construction date

    Proposed operation date

    Transfer ratio

    Guangdong Jinshenglan Metallurgy Technology Co., Ltd.

    Yunfu, Guangdong

    1 electric furnace of 150t

    120

    November 2019

    May 2021

    1.001: 1

    Cancelled Projects

    No.

    Location

    Company

    Facilities

    Transfer capacity (10kt)

    Demolition start date

    Demolition completion date

    Note

    1

     

    Xinjiang

     

    Xinjiang Qinggang Iron and Steel Co., Ltd.

    1 converter of 40t

    50

    Before operation of new project

    Before operation of new project

    The total cancelled capacity is 1.25 million tons, including 1.Asian Metal Copyright 2 Xinjiang Xinjiang Kunyu Iron and Steel Co.Asian Metal Copyright2013 million tons for capacity transfer of the mentioned project.Asian Metal Copyright001: 1 Cancelled Projects No.Asian Metal Copyright The rest of 48,700t will be used in capacity transfer for future projects.

    2

    Xinjiang

    Xinjiang Kunyu Iron and Steel Co., Ltd.

    1 converter of 50t

    75

    Before operation of new project

    Before operation of new project

    Total

    /

    /

    /

    125

    /

    /


    Note: 1. The capacity to be cancelled or built in transfer should be calculated based on the documents from Ministry of Industry and Information Technology.Asian Metal Copyright to build a 150t of electric furnace for steel-making Construction of Project Company Location Facilities Transfer capacity 10kt Proposed construction date Proposed operation date Transfer ratio Guangdong Jinshenglan Metallurgy Technology Co.Asian Metal Copyright The documents only provide reference for transfer ratio.