8th World Antimony Forum

TBD
Guiyang, Guizhou, China

12th Rare Earth Summit

TBD
Hangzhou, Zhejiang, China

11th Aluminum Raw Materials Summit

TBD
Hangzhou, Zhejiang, China

9th Magnesium Summit

TBD
Hangzhou, Zhejiang, China

13th World InBiGeGa Forum

TBD
Hangzhou, Zhejiang, China

7th World Antimony Forum

June 13-14, 2019
Changsha, Hunan, China

7th Refractory & Abrasive Materials Summit 2019

May 23-24, 2019
Qingdao, Shandong, China

10th Aluminum Raw Materials Summit

May 16-17, 2019
Zhengzhou, Henan, China

11th Rare Earth Summit

May 9-10, 2019
Qingdao, Shandong, China

8th Magnesium Summit

April 11-12, 2019
Zhuhai, Guangdong, China

12th World InBiGeGa Forum

March 14-15, 2019
Zhuhai, Guangdong, China

Electric furnace steel-making capacity transfer scheme for Guangdong Jinshenglan Metallurgy Technology

2019-09-18 17:40:36   【Print】
On September 11, Department of Industry and Information Technology of Guangdong sought public opinions on the capacity transfer scheme of Guangdong Jinshenglan Metallurgy Technology Co.Asian Metal Copyright001: 1 Cancelled Projects No.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright to build a 150t of electric furnace for steel-making; the publication period is from September 11, 2019 to October 16, 2019.

Capacity transfer scheme of Guangdong Jinshenglan Metallurgy Technology Co., Ltd. to build a 150t of electric furnace for steel-making

Construction of Project

Company

Location

Facilities

Transfer capacity (10kt)

Proposed construction date

Proposed operation date

Transfer ratio

Guangdong Jinshenglan Metallurgy Technology Co., Ltd.

Yunfu, Guangdong

1 electric furnace of 150t

120

November 2019

May 2021

1.001: 1

Cancelled Projects

No.

Location

Company

Facilities

Transfer capacity (10kt)

Demolition start date

Demolition completion date

Note

1

 

Xinjiang

 

Xinjiang Qinggang Iron and Steel Co., Ltd.

1 converter of 40t

50

Before operation of new project

Before operation of new project

The total cancelled capacity is 1.25 million tons, including 1.Asian Metal Copyright001: 1 Cancelled Projects No.Asian Metal Copyright2013 million tons for capacity transfer of the mentioned project.Asian Metal Copyright The capacity to be cancelled or built in transfer should be calculated based on the documents from Ministry of Industry and Information Technology.Asian Metal Copyright The rest of 48,700t will be used in capacity transfer for future projects.

2

Xinjiang

Xinjiang Kunyu Iron and Steel Co., Ltd.

1 converter of 50t

75

Before operation of new project

Before operation of new project

Total

/

/

/

125

/

/


Note: 1. The capacity to be cancelled or built in transfer should be calculated based on the documents from Ministry of Industry and Information Technology.Asian Metal Copyright Location Company Facilities Transfer capacity 10kt Demolition start date Demolition completion date Note 1 Xinjiang Xinjiang Qinggang Iron and Steel Co.Asian Metal Copyright The documents only provide reference for transfer ratio.